My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-53 2020-10-22
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-53
>
3003 W CASINO RD BLDG 40-53 2020-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 9:49:25 AM
Creation date
4/27/2018 3:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-53
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 51 OS/24/2012 <br /> �' t � � � � <br /> ����II Job: Boeing 40-35/53 Upper Deck AHU <br /> ` �,. �V EQ Number: 16383 <br /> G„SToma;fHand,e,� Date: Aug 24,2012 <br /> Rev.: <br /> UNIT SUPPORT REQUIREMENTS — Units are shipped in sections. Sections to be assembled at the jobsite. See <br /> IOM shipped with unit for details. <br /> — Unit requires fuli perimeter support. Units shipped in multiple sections <br /> require additional support at each of the shipping split locations. <br /> Installation co-ordination and AHU mounting details need to be made <br /> available to AHU manufacturer for review to ensure no interference <br /> issues occur at the jobsite. Installation contractor is responsible for <br /> providing these details to the AHU manufacturer. Contractor to work <br /> with local Trane office and AHU manufacturer. <br /> INERTIA BASE — Structural steel base frame complete with Rebar. <br /> — Supply and installation of concrete is by others <br /> — Isolators must be leveled after concrete is poured. <br /> COIL RACKS — Cooling coil recks are stainless steel <br /> — Heating coil racks are <br /> — Coils are removed through removable access plugs. <br /> PIPE CONNECTIONS — Heating and cooling coil supply and return connections,plus the vent and <br /> drain,will be extended to the outside of the unit#or connection by others. <br /> — Pipe penetrations are sealed with Rubber grommets,or if space restraints <br /> exist,sheet metal collars rings. <br /> — Pipe extension material is Sch.40 blk pipe <br /> — Vent and drain material is Sch.40 blk pipe <br /> — All pipe insulation is by othec <br /> SPARE PARTS/SHIP LOOSE — 2 sets of pre-filters provided <br /> — Section split sheet metal trim,caps,screws,and sealant. <br /> ELECTRICAL — Units are ETL labeled <br /> — Motor is wired to externally mounted Nema 1 junction box. <br /> — EMT Conduit,Zinc Die-cast Compression Connector,and Flexible metai <br /> Conduit(FMC)are standard conduits. <br /> — Electrical enclosures downstream(2 feet)of the cooling coil and <br /> downstream of the humidifier grid are to be rated for`wet location'. <br /> — Standard Lighting is Standard Single Pole 15A Switch,Marine Glass Globe <br /> with Wire Guard,26W fluorescent bulb,and Standard 20A GFIC Receptac�es. <br /> TESTING "Fans will be factory run and checked for proper operation/rotation and motor <br /> amp draw. <br /> Trpne Custom 9900 Aire Circle,Fort Smith,AR 72916 Phone:(479)648-7400 Fax:(479)648-7499 <br />
The URL can be used to link to this page
Your browser does not support the video tag.