Laserfiche WebLink
�• � <br /> � �` =�� PUBLIC WORKS PERMIT Date: 5/30/2014 <br /> {� Fublic Works Permit#: PW1405-038 <br /> �� City of Everett Public Works Department <br /> `�� Building Permit#; <br /> 3200 Cedar Street <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 461,077.49 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BOEING COMPANY <br /> PO BOX 3707 MC OH-13 <br /> SEATTLE Wq 98124 <br /> PHONE: 4258762594 PHONE: <br /> TAX PARCEL ID# 28041000100200 SITE ADDRESS: 3003 W CASINO RD 40-58 <br /> DESCRIPTION OF PROPOSED WORK: . <br /> INFRASTRUCTURE & SITE WORK TO SUPPORT NEW 40-58 BLDG-BOEING <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. As per plan submitted 5/30/2014 and subsequent revisions. <br /> Your Public Works Inspector is Randy Allen. Call 425-339-7403 for any questions and/or inspections. � <br /> Fees to be determined and billed to Boeing upon submittal of the cost estimate form. �"� <br /> � <br /> � <br /> � <br /> h <br /> � <br /> � <br /> . � <br /> � <br /> � <br /> � <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> A roved for Construction Date to remove same upon notice from the City and to replace <br /> pP public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CIIY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> �� <br />