Laserfiche WebLink
INSPECTION REPORT <br /> Date. /4/,)— Permit: <br /> Contractor: <br /> A44 <br /> O ner: /� r I <br /> ee dds: " - th <br /> TYPE OF INSPECTION REQUESTED <br /> ELECT BUILDING MECHANICAL PLUMBING <br /> �Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> Ground3vork [:1 Footing ❑Rough In El Rough In <br /> ❑Slab/Con ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> oug In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTH&LOR CONSULTATION: <br /> APPRO ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour noti a required <br /> Ott 4 - <br /> Inspect o Date: <br /> EIR(4/09) FORMS&PROMOTIONS 425/488-8900 <br />