Laserfiche WebLink
Seatronics,Inc. Boeing 45-012 Building—EDC Static Test Facility-Phase 2 Section 1 <br /> Job: 111008 Fire Alarm System Data Submittal Manual Page 1 <br /> PROJECT GENERAL SCOPE OF WORK: <br /> PART"A"-45-12 STATIC TEST BUILDING MODIFICATIONS: <br /> 1. NEW RAISED CONTROL ROOM SPACE IS BEING ADDED INSIDE OF BUILDING ON THE EAST <br /> SIDE. PROVIDE THE FOLLOWING FIRE ALARM SYSTEM MODIFICATIONS TO SUPPORT THIS <br /> SPACE: <br /> A. RELOCATE EXISTING HORN-STROBES (2) FROM THE SPACE UNDER THE NEW CONTROL <br /> ROOM TO THE PERIMETER OF THE CONTROL ROOM SPACE FACING THE MAIN HIGH BAY <br /> AREA. <br /> B. INSTALL NEW ADDITIONAL HORN-STROBE (1) IN THE SPACE BELOW THE NEW CONTROL <br /> ROOM. <br /> C. INSTALL NEW CEILING MOUNTED HORN-STROBES (2)AND STROBES(2) IN THE NEW <br /> CONTROL ROOM. THESE DEVICES WILL BE ON A NEW NAC CIRCUIT FED FROM THE <br /> EXISTING NORTHEAST NAC POWER SUPPLY PANEL. <br /> D. INSTALL NEW MONITOR MODULES(2)TO MONITOR NEW SPRINKLER VALVE FLOW AND <br /> TAMPER SWITCHES FOR THE NEW CONTROL ROOM SPRINKLER SYSTEM. <br /> 2. NEW HYDRAULICS ROOM SPACE IS BEING ADDED TO THE SOUTH OUTSIDE OF THE <br /> BUILDING. PROVIDE THE FOLLOWING FIRE ALARM SYSTEM MODIFICATIONS TO SUPPORT <br /> THiS SPACE: <br /> A. INSTALL HORN-STROBE IN HYDRAULICS ROOM 11G13AND INSTALL HORN-STROBE IN <br /> HYDRAULICS ROOM 11 H13. <br /> B. INSTALL NEW MONITOR MODULES (2)TO MONITOR NEW SPRINKLER VALVE FLOW AND <br /> TAMPER SWITCHES FOR THE NEW HYDRAULICS ROOMS SPRINKLER SYSTEM. <br /> 3. SYSTEM SHALL TRANSMIT ALL NEW DEVICE ALARM, SUPERVISORY OR TROUBLE SIGNALS <br /> TO THE CENTRAL STATION (TYCO). <br /> PART"B"-NEW SUPPORT TRAILER& EXISTING TRAILER MODIFICATIONS: <br /> 1. ONE NEW SUPPORT TRAILER IS BEING ADDED TO THE PROJECT SITE AT THE BOEING 45-12 <br /> BUILDING ON THE SOUTH YARD SIDE OF THE BUILDING. THIS NEW SUPPORT TRAILER IS <br /> DESIGNATED AS THE BOEING 45-116 BUILDING. PROVIDE THE FOLLOWING FIRE ALARM <br /> EQUIPMENT FOR THE TRAILER. <br /> A. EVACUATION ALARMS (HORN-STROBES) <br /> B. SMOKE DETECTION <br /> C. MANUAL PULL STATIONS AT EXITS <br /> D. EXTERIOR HORN-STROBE <br /> 2. FOR BOTH EXISTING SUPPORT TRAILERS 45-112 AND 45-113, THE WALL BETWEEN THE <br /> CONFERENCE ROOM AND THE MAIN SPACE IS BEING REMOVED TO CF�EATE A SINGLE <br /> SPACE IN THE TRAILERS. <br /> A. REMOVE EXISTING STROBE AND SMOKE DETECTOR FROM THE CONFERENCE ROOM <br /> AREA IN EACH TRAILER. <br /> B. ADJUST SPACING OF EXISTING TWO SMOKE DETECTORS IN THE MAIN SPACE OF THE <br /> TRAILER AS INDICATED ON PLANS TO PROVIDE PROPER COVERAGE. <br /> C. EXISTING MAIN SPACE HORN-STROBES PROVIDE ADEQUATE COVERAGE FOR THE NEW <br /> LARGER MAIN SPACE WITHOUT ADDITIONAL NOTIFICATION DEVICES BEING REQUIRED. <br /> 3. SYSTEM SHALL TRANSMIT ALL NEW DEVICE ALARM, SUPERVISORY OR TROUBLE SIGNALS <br /> TO THE CENTRAL STATION (TYCO). <br /> Seatronics, Inc. PO BOX 1138 Auburn,WA 98001 253-939-6060 <br />