Laserfiche WebLink
s ACOFF11AN Structural • Mechanical • Electrical • Civil <br /> n, NGINEERS Corrosion Control • PM/CM <br /> nv-310 - 00i, <br /> February 19,2016 <br /> The Boeing Company <br /> Attn: Damir Alic <br /> Everett,WA <br /> Project: Boeing Building 45-012 <br /> New Manufacturing Building <br /> Everett,WA <br /> To Whom it May Concern: <br /> • <br /> To the best of my information,knowledge,and belief,based on site observation visits conducted <br /> by myself or an employee of my firm,and the review of special inspection/test reports,the <br /> Primary Structural Frame of the building is complete and the work has been performed in a <br /> manner consistent with the construction documents and in accordance with applicable building <br /> codes. <br /> g9i So ®j. <br /> Sincerely, r <br /> t' <br /> t 4 <br /> ,.,,.. ,, <br /> , . , ,.. <br /> :...„,,,,;„ ,, <br /> -.Ai, , . - ' . . ,,,,, <br /> ;.,....,,__. , _ <br /> �'AIAi.,„ ,,,, <br /> 2-19-16 <br /> Emery Ojala, S.E. ,?'.`P,.. <br /> Principal <br /> Structural Engineering <br /> eso:eso <br /> P:1Seall4Jobs1141001 Boeing EDC Static Test Faclty Evrttll.0 CORRESPONDENCEIStructural Completion Letter.doc <br /> SEATTLE ANCHORAGE BAY AREA GUAM HONOLULU LOS ANGELES SPOKANE <br /> 1601 FifhAve.,Suite900 907.276.6664 510.251.9578 671.300.7531 808.687.8884 818.285.2650 509.328.2994 <br /> Seattle,WA 98101-1620 <br /> 0 <br /> 206.623.0717 LASTING creativity I results j relationships <br />