Laserfiche WebLink
Component Perform ,ce Path, pg. 1 Zo .s 4c/5b ENV-UA <br /> 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Oct 2013 <br /> Project Address Boeing Everett Facility Date 09/04/2015 <br /> Occupancy Group @ Commercial 0 Group R For Building Department Use <br /> Change in occupancy or space conditioning 0 <br /> Note-Proposed UA may exceed Target UA by 10%per C101.4.4 and C101.4.5 <br /> Fenestration Area as%gross above-grade wall area 0.0% Max.Target: 30.0% <br /> Skylight Area as%gross roof area 0.0% Max.Target: 5.0% <br /> Vertical Fenestration Alternates: None Selected on ENV-SUM <br /> Notes: 1:If vertical fenestration or skylight area exceeds maximum allowed per C402.3.1, then Target Area Adjustment of all applicable envelope <br /> elements will be calculated by the compliance form. Refer to Target Area Adjustments worksheet for this calculation. <br /> 2:U-factors shall come from Appendix A, Chapter C303, or calculated per approved method as specified in C402.1.2. <br /> Building Component Proposed UA Target UA <br /> Provide source of U-factor,page/plan#of assembly detail&ID U-factor x Area(A) =UA(U x A; U-factor x Area(A)= UA(U x A) <br /> R= ID:Single-ply roofing with 5"polyiso insulation 0.033 109657 3618.7 0.034 109657 3728.3 <br /> 'di R= ID: Above Deck Insulation U-0.034 <br /> 0 <br /> R= ID: <br /> N -o R= ID: 0.031 <br /> 1,5 00 R= ID: Metal Building U-0.031 <br /> R= ID: <br /> R= ID: 0.021 <br /> -c R= ID: Single raft,attic,other U-0.021 <br /> R= ID: <br /> E R= ID:Insulated metal wall panel 0.049 148510 7277.0 0.055 148510 8168.1 <br /> Lt R= ID: Steel/metal frame U-0.055 <br /> 2 R= ID: <br /> c <br /> o •• R= ID: 0.052 <br /> Q m R= ID: Metal Building U-0.052 <br /> N R= ID: <br /> To <br /> 5 R= ID: 0.054 <br /> S o R= ID: Wood Frame,other U-0.054 <br /> m o <br /> o. R= ID: <br /> 0 <br /> R= ID: 0.104 <br /> U) <br /> a R= ID: Mass Wall U-0.104 <br /> R= ID: <br /> y R= ID: 0.104 <br /> To <br /> o R= ID: Assumed to be Mass Wall U-0.104 <br /> 6 <br /> m2 R= ID: <br /> 0 R= ID: <br /> N R= ID: 0.031 <br /> m R= ID: Mass Floor U-0.031 <br /> N`o R= ID: <br /> ti -0,1, R= ID: 0.029 <br /> m R= ID: Joist/Framing U-0.029 <br /> LI- R= ID: <br /> _ F-factor x Perimeter =UA(U x A) F-factor x Perimeter= UA(U x A) <br /> I 13 R= ID:Perimeter foundation insulation 0.540 1039 561.1 0.540 1318 711.7 <br /> r R= ID:Rigid insulation at hangar door 0.730 279 203.7 Slab-On-Grade U-0.54 <br /> F2� <br /> ' c <br /> n R= ID: <br /> 0 R= ID: 0.550 <br /> 19. 73 R= ID: Heated Slab-On-Grade U-0.55 <br /> co o <br /> = R= ID: <br /> "Proposed non-residential CMU walls meeting Table C402.1.2 Area UA Area UA <br /> Footnote D requirements can use the target U-value of 0.104 rather Page 1 <br /> than Appendix A values. Show footnote requirements in plans. Subtotal 259485 11660 259485 12608 <br /> Component Performance Compliance (UA) UA COMPLIES. y <br />