Laserfiche WebLink
, <br /> y <br /> Boeing 777X Static Test Facility 19106-01 <br /> February 29,2016 Page 2 <br /> 3. Drilled Shaft Installation. We observed the installation of the six drilled shafts on a full-time basis <br /> between September 15 and 21, 2015. The shafts were installed to the proper depth and generally <br /> within the anticipated soil conditions based on comparison of soil cuttings from the pier <br /> installation and review of nearby soil exploration logs. <br /> We have completed our work at the site. To the best of our knowledge,the construction related to the <br /> above-referenced items generally conformed to the recommendations contained in our geotechnical <br /> report,our input during construction,and the project plans. Our knowledge is based on the information <br /> contained in our daily field reports as well as correspondence during construction. <br /> We trust this letter meets your needs. Please call if there are any questions or concerns. <br /> Sincerely, <br /> HART CROWSER,INC. <br /> V AYE <br /> of �- <br /> 04. ,3$3ssisoto <br /> SSiOG <br /> NAI. <br /> DOUGLAS D.LINDQUIST, PE, LEED AP <br /> Principal Geotechnical Engineer <br /> cc: Mary O'Hara,Coffman Engineers <br /> L:\Notebooks\1910601_777x Static Testing Building\Deliverables\Letter-Final Inspection 02-29-16\Boeing 777X-Final_Letter.docx <br />