Laserfiche WebLink
Seatronics,Inc.Job#111008 BOEING EVERETT 45-12 BLDG,STATIC TEST FACILITY PHASE 2 Acceptance Test Procedure <br /> FIRE ALARM SYSTEM MODIFICATIONS&ADDITIONS Page 5 of 6 <br /> 7.0 BATTERY POWER TEST CONDITIONS: <br /> 7.1 Perform standby battery power tests per conditions in the following tables: <br /> Line Battery Power Test Condition-FAP Battery(VDC) Pass Fail <br /> 1. Measure and record battery charger voltage with primary AC power on. <br /> 2. Disconnect the 120VAC primary power source. Measure and record battery voltage. <br /> 3 Actuate alarm condition Measure and record battery voltage with audiblelstrobes <br /> activated. <br /> 7.2 Restore primary AC to the panel(s). Reset and restore the panels to normal operating mode. <br /> 8.0 SECURE FROM TEST <br /> 8.1 Verify that the control panel is in normal supervisory condition. <br /> 8.2 Instruct the operating personnel in the proper operation of the system. <br />