Laserfiche WebLink
INSPECTION REPORT <br /> Date � Permit:�;_1���p —�_�l <br /> Contractor: �� 't,����� <br /> Owner: �SJ��t✓� ����,'S��� <br /> Site Address: �.�� �`r� �Q. <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL` PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medicaf Gas <br /> ❑Ceiting Grid ❑Drywall Nailing ❑Plumbing Final <br /> �.Etectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> �PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMI'�,� <br /> f� OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION `C�' <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> �. <br /> �_ ���'�_ ` �� <br /> �� � <br /> � <br /> r,� % <br /> � '` Date: � �� � � <br /> inspector: • � <br /> �� DATABAR,INC. <br />�� EIR(10/O6) � • <br />