Laserfiche WebLink
INSPECTION REPORT <br /> Date � � U Permit: �j����'Ov"� <br /> Contractor: ��� 1�S ��in <br /> Owner: ���� �b"(� . <br /> Si#e Address: <br /> TYPE OF iNSPECTION REQUESTED <br />- ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp 8ervice ❑UFER ground ❑Groundwork/Siab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough 1n ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough�n ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> O ER OR CONSULTATION: �-f�� �"�-'U'��� `��✓CA��� <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P I <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNAB�E TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> L/ <br /> Inspector: Date: � � � <br /> EIR(10/06) DATABAR,INC. <br />