My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 955-83
>
Ordinances
>
Ordinance 955-83
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2018 10:07:09 AM
Creation date
5/1/2018 10:07:07 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
955-83
Date
6/29/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• NOW, THEREFORE, .BE IT ORDAINED BY THE EVERETT CITY COUNCIL <br /> THAT: <br /> Section 1 : A special construction fund is hereby established <br /> as Fund #359 entitled "Design and Construction of <br /> Southwest Everett Sewer ULID #1 Sewer Facilities" <br /> to accomplish the actions authorized in subsequen• <br /> sections of this Ordinance. <br /> Section 2 : Authorization is hereby granted to the Director <br /> of Public Works under the administration of the <br /> Mayor to design and construct the following <br /> Sewer System Improvements: <br /> A. Mukilteo Beach Interceptor. <br /> B. Pump Station #1 . <br /> C. Southwest Interceptor. <br /> D. Southend Interceptor. <br /> E. Treatment Plant Headworks . <br /> The above mentioned improvements shall be con- <br /> nected one to the other and to existing sewer <br /> facilities as required to provide a complete <br /> operating system. <br /> Section 3 : The total estimated cost of the improvements <br /> herein authorized is $26 , 430 , 000 which will <br /> include all costs related to design, construction, <br /> contract administration, plan development and <br /> associated costs. <br /> Section 4: The sum of $26, 430 , 000 is hereby appropriated to <br /> Fund #359 , "Design and Construction of Southwest <br /> Everett Sewer ULID #1 Sewer Facilities" , as <br /> follows : <br /> 1 . Program #853 (Non-Grant Eligible) $11 , 832 , 000 <br /> Contracts 1 , 2 and 4 <br /> Mukilteo Beach Interceptor,Contract #1 <br /> Southwest Interceptor, Contract #2 <br /> Pump Station #1 , Contract #4 <br /> 2 . Program #854 (Grant Eligible) $14 ,598 , 000 <br /> Southend Interceptor, Contract #3A <br /> Southend Interceptor (River Crossing) <br /> Contract #3B <br /> Treatment Plant Headworks, Contract #5 <br /> TOTAL $26 , 430 , 000 <br /> Actual funds expended on each of the programs <br /> listed above may vary from the amounts indicated. <br /> Funds may be adjusted within the above designated <br /> programs to remain within the total budgeted <br /> amount. <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.