Laserfiche WebLink
• <br /> the form of the original approved construction plan or.photo <br /> mylar and shall be subnnitted•within 30 days of connection. <br /> 0, Traffic Control. If Owner finds that a signal is warranted for <br /> traffic control of Owner's traffic, then the improvement cost <br /> responsibility would be Owner's. Any traffic control would require <br /> City Traffic Engineer approval. <br /> P. Site Preparation. Site preparation shall not commence until a <br /> clearing permit has been issued. <br /> Q. Building Permits. No building permits will be issued until the final <br /> site plan has been approved by the City's Planning Director. <br /> Section 6: CODE COMPLIANCE. Owner agrees that all construction <br /> shall conform to the requirements of the City's Building Code in effect at the time <br /> of building permit application. In addition, Owner agrees to comply with all <br /> applicable ordinances, statutes, regulations and codes. <br /> Section 7: PHASE 1 CHANGES DURING CONSTRUCTION. Owner <br /> agrees that all layout, development and maintenance shall be per this Agreement <br /> /" and the approved site plan. However, should the Owner desire to make any changes <br /> during construction in the approved site plan or terms of this Agreement, the <br /> Owner shall bring this to the immediate attention of the City's Planning Director. <br /> If in the opinion of the Planning Director the change is not a substantial change and <br /> only results in a change in the final site plan or in the conditions set forth in <br /> Section 4 or Section 5 of this Agreement, the Planning Director may authorize the <br /> change by having the Owner and the Planning Director sign off on the change and <br /> attach it to the appropriate document (final site plan or this Agreement). <br /> However, if in the opinion of the Planning Director the requested change is a <br /> substantial change or a change involving a change in one or more sections of this <br /> Agreement other than Section 4 or Section 5, the Owner shall be required to go to <br /> the Planning Commission/Hearing Examiner to seek authorization for the proposed <br /> r,;, change. The Planning Director's ruling may be appealed to the Hearing Examiner. <br /> In any event, anytime a change results in a change to the terms or requirements of <br /> this Agreement (other than non-substantial changes to Section 4 and Section 5), <br /> this Agreement must be amended by written amendments hereto duly executed by <br /> the Owner and the City's Mayor. <br /> Section 8: SUBSEQUENT PHASES. That this Agreement only <br /> authorizes the development of Phase I. However, in approving Phase I, the City <br /> acknowledges that Owner is contemplating expanding his facilities once all of the <br /> requirements of Phase I have been met. The City will consider an expansion of <br /> Owner's facilities only if the following issues are addressed, appropriate mitigation <br /> measures implemented as well as any additional City concerns addressed: <br /> -5- <br />