Laserfiche WebLink
INSPECTION REPORT <br /> Date � �� Permit: � ���2� �(p� <br /> Contractor: ���(�. �i�2C�C LC.� <br /> Owner: �� �� <br /> SiteAddress:�?,�_ �(�`l� ��31/'C� _ <br /> —�— <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDWG MECHANICAL PLUMBWG <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough Jn <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medicai Gas <br /> �eiling Grid ❑Drywali Nailing ❑Piumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:-����—�'��V t�------ ---- <br /> AP ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE IT <br /> FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date. ( <br /> � EIR(10/06) DATABAR,WC. <br />