Laserfiche WebLink
INSPECTION REPORT <br /> Date �d n Permit: � �/ 7l�/t�'�/�,� <br /> � _ t7 <br /> r <br /> Contractor: V� /�L} �" <br /> Owner: �rV1 <br /> Site Address: �� ��/ (... n/V�ij� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> �Temp Service ❑UFER gcound ❑Groundwork/Slab ❑Groundwork/Siab <br /> ❑Groundwork ❑Footing ❑Rough in ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OKto insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Jnsulation ❑Mechanical Finai ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Piumbing Final <br /> ❑Electrical Finai ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑C iling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains uilding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ RTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. �/�RECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> ,� _ r <br /> C T <br /> A <br /> Inspector: Date: V � " <br /> EIR(10/06) � � TABAR,WC. <br />