Laserfiche WebLink
2015 WaShII1gt011 StBt@ Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 <br /> 2015 Washin ton State Ener Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Janua 2017 <br /> Project Information Project Title: temasters#38 - Date 1/1/2015 <br /> Applicant Information. Provide contact information for individual who can respond to For Building Dept.Use <br /> inquiries about compliance form information provided. <br /> Company Name: Evergreen State Heat&A/C <br /> Company Address: 2120 Pacific Ave,Everett,WA 98201 <br /> Applicant Name: Mark Payne <br /> Applicant Phone: 425-252-3114 <br /> Project Description ❑ New Building ❑ Building Addition ❑ Tenant Improvement � System Retrofit ❑ No System Changes <br /> eriefly describe mechanical systems in Re laCin like for Ilke with same Ca aCi <br /> the text box provided p 9 p ty,power requirements and gas heat as old unit..old unit provided <br /> sufficent heating and cooling.Units are single phase 4 ton split system. <br /> � Total Bldg Pertormance(TBP) <br /> This path includes all mandatory <br /> provisions per C401.2 Option 2. <br /> MECH-SUM,MECH-CHK,and C407 <br /> Energy Analysis forms required. <br /> � Load calculation summary Q MECH-LOAD-CALC Form <br /> DeSlgri L01(�C11CUI1t10riS Provide design load calculations for all mechanical systems and equipment serving the building heating,cooling or <br /> ventilating needs.If a load calculation summary is provided with the permit documents thaf includes all applicable <br /> compliance information then the MECH-LOAD-CALC form is not required. <br /> Q✓ Mechanical Plans [❑ MECH-EQ Forms(TBD) <br /> MeC�1dri1C11 SCIleC�illeS Indicate location of equipment compiiance information.If provided on plans then MECH-EQ forms are not required, <br /> however,include on plans all applicable compliance information listed in MECH-EQ tabies. <br /> � DOAS is required per C403.6 effective July 1,2017(office,retail,education,library and fire station occupancies) <br /> All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does <br /> not require space conditioning fan operation.Space conditioning fans cycled off when no heating or cooling is required. <br /> DeC1lCdteC�OtltCLOOT AlY ❑ Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS(C403.6,Exception 1) <br /> Systern Requirements and ❑ 2entilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS(C403.6,Exception <br /> ) <br /> High Efficiency VAV '(❑ DOAS included in project,although not required(occupancy not office,retail,education,library or fire station) <br /> Alternate <br /> ❑ DOAS related allowances included in project: <br /> ❑ Prescriptive vertical fenestration maximum area allowance increased to 40%per C402.4.1.4 with 100%of <br /> conditioned floor area in building served by DOAS. <br /> ❑ Exception to air economizer per C403.3 Exception 1,include MECH-ECONO form. <br /> Q Project includes HVAC air distribution systems that provide heating and/or cooling <br /> If yes,provide a MECH-FANSYS-SUM form. <br /> Fan Power � For one or more systems,the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. <br /> If yes,provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. <br /> Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. <br /> � Hydronic chilled water Q Water-loop heat pump � No hydronic systems <br /> HVAC Hydronic Systems <br /> Q Hydronic heating water [� Geothermal <br /> Q C406.2 More efficient HVAC equipment and fan systems <br /> Requires 90%of heating and cooling capacify to be equipment listed in tables C403.2.3(1)-(9)or air-to-waterheat <br /> pumps and heat recovery chillers.Al!equipment listed in tables C403.2.3(1)-(7)must be 15%more efficient than <br /> minimum requirements.All stand a/one supply,retum,and exhaust fans over 1hp must have FEQ z 71 and must be <br /> C406 Additional Efficiency selected within 10%of maximum fotai or static pressure. <br /> ❑ C406.6 Dedicated outdoor air system(DOAS) <br /> Opt10riS-MeC1i1ri1C11 Requires 90%of conditioned floorarea to be served by a DOAS per C403.6 fhat delivers required ventilation air in a <br /> manner that does not require space conditioning fan operation. <br /> Q C406.7 Reduced energy in service water heating <br /> Reguires 90%of floor area be in occupancy types listed in C406.7.1 and that 60%of annual hot water energy use be <br /> provided by heat pump, waste heat recovery or so/ar water-heating systems. <br />