Laserfiche WebLink
� � "� 1. Original meter & � 11. Install stabilizer - <br /> �,,,.,,:� <br /> � - plumbing before any ti �' , �e- bracket ( Unistrut or <br /> �;�,��1 work has begun. --a equivalent ) to <br /> � �� plumbing ( within 6" --' <br /> � �.� „;� '��' <br /> of valve ) and "'� � "�""`� <br /> � ��� � secure to building. _ � � <br /> J •5� ..: � _ .... �P'n_ 1— _.'' <br /> 7. Configure new 8. Use teflon tape or <br /> �" ` '` 2. Turn gas off at plumbing with PSP liquid sealant on all 12. Finish meter = <br /> ,�, meter inlet valve, valve. , joints. plumbing system ' � <br /> do not use a pipe with PSP seismic �, <br /> ' � ;> wrench. � valve. � � <br /> i�`� Note: For aesthetics, level �� <br /> ! �1_. '°� Note: If valve is difficuft to <br /> move contact your utility ! ' stabilizer bracket. <br /> �? � company. � <br /> — / <br /> � - 13. While gas is <br /> ' u 3. Loosen meter _ � . F� , ��a9A ��f, open seis- <br /> � , �� i <br /> �� ,y swiveL -, � - �- - "� � � - _^ mic valve. Do not "�� <br /> �, 9. Install union gasket 10. Using chain level � <br /> � ��,�� open against gas <br /> and new plumbing site, confirm valve is <br /> - - �� from meter to build- level. Allow 5"to 6"from pressure. -' <br /> . = r� <br /> ing. wall for valve reset shaft <br /> � clearance. <br /> — �-�� Warning! Read and undersQand the fiollowing sections com- - <br /> �' � 7 4. Take care not to pletely before attempting to reset valve. 14. TUPn gaS On at �� <br /> j� f- '� ruin gasket when Opening&Resetting of the Valve•Models 300,so�,soz,303 meter inlet valve, 5� ~ `� <br /> `� When the valve is closed a Red Bar will be visible throu h the win- <br /> �� ��? removing union. g do not use pipe ! <br /> ,y,�, ' " dow in the visual valve position indicator located on the bottom of the � � <br /> ` � ',, �; valve cover. To open the valve first verify that the main gas shutoff WrenCll. Note:Open gas �>. � <br /> .:.� Note: If gasket is damaged, valve slowl to revent dam � `� <br /> call your utility company for valve is closed, then gently rotate the Reset Shaft (located on the Y p �� <br /> replacement. side of the valve) in the direction indicated by the "to open" arrow, age to regulator. <br /> until the Green Bar is visible through the window. Release the turn- <br /> ing effort.If reset has occurred the Reset Shaft will return to its origi- <br /> -w--���; 5. Remove existing nal position, and the Green Bar will remain visible through the win- 15. US2 SOapy <br /> ' ''>t plumbing after meter. dow.Tne vaive is now open,and the acceleration trigger mechanism <br /> � .a set to respond to a seismic disturbance.You may now open the main solution to check for �� ��.� <br /> , gasshutoffvalve. IeakS. °�.° �A� ,�;�• <br /> �' Opening&Resetting of the Valve-Models 310,311,312,313,314,314F; <br /> � � 315,315F,316,316F,317F,318,318F and 319F. � T <br /> j When the valve is closed a Red Bar will be visible through the win- <br /> dow in the visual valve position indicator located on the bottom cover <br /> of the valve.To open the valve,first verify that the main gas shutoff <br /> 6. Wlth original valve is closed, then gently rotate the Reset Shaft in the direction <br /> . plumbing removed � �ndicated by the"to open"arrow,which opens the pressure release <br /> � poppet in the main valve disc. Hold in this position until pressure 16. A I aint to <br /> ���t :� build new plumbing equalizes across the main valve disc, then with very little turning all new plu bing to �z �� <br /> � ''� from structure t0 effort, continue rotating the Reset Shaft until a Green Bar is visible - � ,� <br /> - �: through the window. Release the turning effort. If reset has occurred prevent rust. :� _ <br /> meter. � "���"�� <br /> the Reset Shaft will return to its original position and the Green Bar �_ <br /> � �`' will remain visible through the window.The valve is now open, and _,e� <br /> -� the acceleration trigger mechanism set to respond to a seismic dis- <br /> - turbance.You may now open the main gas shutoff valve. �_ �'' <br />