Laserfiche WebLink
,:- INSPECTION REPORT <br /> �� Date �I I Z I/8 Permit: �I�d q—/�;L <br /> Contractor: C,f�1'��.0 _��pG�'l'G ----- <br /> Owner: ���J'%i?�' /TGG7`�'LO �'Z — <br /> ✓ <br /> Site Address:���/ /2�fj� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structurai Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> �❑ eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final. ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL T P <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: ______ __ ___ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> � <br /> � � t �L/1"t— ���T�l«�- <br /> Inspecto Date: � <br /> EIR(10/06) � DATABAR,INC: � <br />