Laserfiche WebLink
INSPECTION REPORT <br /> - Date Permit:� � G Q� "�Q� � <br /> s Contractor: � �'1 �7" <br /> � �� <br /> Owner: <br /> � <br /> Site Address: � � � � �f <br /> ��. <br /> TYPE OF INSPECTION REQUESTED <br /> ELEGTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing, ❑Rough In ❑Rough In <br /> , ❑SlablConduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> �Rough in ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> 0 Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation �Mechanicai Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing '�lumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Finai ❑Gas Pipe Final ❑HWT Final <br /> O ER OR CONSULTATION: T"9 �� 5� �� � <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ K FOR T.C.O. ❑ CORRECTION REQUESTED - � <br /> ❑ OK FOR C:O. ❑ VIO�ATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> _ � � <br /> -'� <br /> Inspector: Date: ��� <br /> EIR(10/06) DATABAR,INC. <br />