Laserfiche WebLink
INSPECTION REPORT <br /> Date_ ` _l��/� Permit: __ � � v " �y�` � ----_ <br /> / <br /> Contractor: ���/ <br /> ��—. 1�,�� owner: — -------- <br /> Site Address: �l.(� � 7 ����% vY <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Gr ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> �ng ri ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Fin I ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> rains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:-------_.._------------ -----------__----- <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE T <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: __________A___________— _ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> / '/ f� 1�t�� _j��T/Z(�`� <br /> Inspecto Date: <br /> EIR(10/06) DATABAR,INC. <br />