My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> utility facilities, unless otherwise agreed upon by the parties involved. A business day <br /> is defined as any day other than Saturday, Sunday, or a legal local, State, or Federal <br /> holiday. <br /> The Contractor shall be responsible for determining the exact location, including <br /> service connections, of all public and private underground utilities marked at the site of <br /> the Work. Perform field verification prior to beginning Work that could result in damage <br /> to buried utilities, including but not limited to exploratory excavations, in sufficient time <br /> so as not to impede the progress of the Work or fabrication of materials to be <br /> incorporated into the Work. The Contractor shall immediately notify the City's <br /> Representative as to any utility discovered by him in a different position than shown on <br /> the Plans or that is not shown on the Plans. <br /> No excavation shall begin until all known underground public and private utilities in the <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of <br /> ' the City to show the existence of subsurface objects or installation on the Plans shall <br /> not relieve the Contractor from its responsibility to make an independent check on the <br /> ground, nor relieve Contractor from all liability for damages resulting from its <br /> operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the <br /> agencies that have utilities in place and to coordinate with these agencies in the <br /> protection and relocation of the various underground installations. These agencies will <br /> give assistance in the location of the various utilities, but this shall not relieve the <br /> Contractor from responsibility for any damage incurred. The City shall require a <br /> notification of at least five working days. The Contractor shall hold the City harmless <br /> against any claim of any nature resulting from Delays in attending to same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience: <br /> Snohomish County PUD #1 Puget Sound Energy <br /> P.O. Box 1107 P.O. Box 97034 BOT-01G <br /> Everett, Washington 98206 Bellevue, WA 98009-9734 <br /> Attn: Erin Burke Attn: Lisa Griffith <br /> Tel. (425) 783-4745 Tel. (425) 424-6472 <br /> Email: EFBurke@SNOPUD.com Email: lisa.griffith@pse.com <br /> Frontier Communications NW CenturyLink Network <br /> Attn: Tim Rennick 1208 NE 64th Street, Rm 401 <br /> MC WA0104OS Seattle, WA 98115-6722 <br /> 1800 41St St Attn: Jack Johnson <br /> Everett, Washington 98201 Tel. (206) 345-0230 <br /> Tel. 425-263-4025. <br /> Email: tim.rennick@ftr.com <br /> I <br /> I <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—81 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.