<br /> CITY OF EVERETT SPECIAL PROVISIONS
<br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and
<br /> backfilled to the total quantity of pipe listed on the Proposal.
<br /> The lump sum bid item includes the costs directly allocated to the safety system for
<br /> trenches and all other excavations including, but not limited to, shoring, benching, bracing,
<br /> excavation, sheeting, and trench box. This Work shall be accomplished in accordance with
<br /> Divisions 1, 2, 7, and 8 of the Standard Specifications and these Special Provisions.
<br /> Payment per lump sum includes all equipment, materials, labor, installation, and removal,
<br /> and all other work required to meet the trench excavation and safety system requirements.
<br /> Bid Item 8 - Street Cleaning and Sweeping
<br /> Measurement and Payment: Unit Price per Hour (HR)
<br /> The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all
<br /> labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning,
<br /> and dust control water required for this project.
<br /> Measurement for street sweeping and cleaning will be by the hour for the actual time
<br /> consumed in pavement sweeping, cleaning and debris removal. No allowance will be
<br /> made for time consumed in making repairs to the equipment or for moving the equipment to
<br /> or from the site on which the street cleaning is ordered. No separate payment will be made
<br /> for water required for dust control and the normal operation of the pickup sweepers.
<br /> Bid Item 9 - Erosion/Water Pollution Control
<br /> Measurement and Payment: Force Account (FA)
<br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE
<br /> ACCOUNT; except, as modified below.
<br /> Erosion/Water Pollution Control, Force Account, shall constitute full compensation for all
<br /> labor, materials, tools and equipment necessary and incidental for the installation,
<br /> maintenance and removal of the temporary erosion and sedimentation control (TESC)
<br /> facilities to prevent pollution, erosion, siltation, and damage to any wetland, stream, other
<br /> watercourse, or surrounding property throughout the life of the Contract. TESC facilities
<br /> shall include, but not be limited to, any cover measures, runoff control measures, soil and
<br /> site stabilization measures, filter fabric fencing as shown on the Plans, and inlet protection
<br /> measures for the work area and downstream areas.
<br /> The TESC measures shall limit the erosion possibility by covering disturbed soils,
<br /> preventing sloughing or raveling of cut and natural slopes, and controlling surface runoff
<br /> from flowing into excavations using measures such as curbs, berms, dikes, rock-lined
<br /> ditches, and other approved measures. Filter fabric fence shall be used to treat small
<br /> areas of non-concentrated runoff prior to discharge from the site.
<br /> Bid Item 10 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Up To 6-Inch
<br /> Thickness
<br /> Measurement and Payment: Unit Price per Linear Foot (LF)
<br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut.
<br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6-
<br /> inch thickness, shall be full compensation for all labor, material, tools, and equipment
<br /> necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the
<br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit
<br /> price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6-inch
<br /> thickness includes, but is not limited to, the saw-cutting necessary for the final joint
<br /> between existing pavement and permanent HMA pavement.
<br /> Water Main Replacement"Q" Division B-BID DESCRIPTIONS February 9, 2018
<br /> -Evergreen Way Rebid
<br /> WO No.-UP3612 SP-5