My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS <br /> shall provide documentation substantiating the cost allocation if asked by the City's <br /> Representative. Upon acceptance of the Schedule of Values by the City's <br /> Representative, it shall be used as a basis for all requests for payment. <br /> 1-09.4 Equitable Adjustment <br /> ' Supplement 1-09.4 by adding the following: <br /> Other means to establish the reasonable cost of the Work not defined by unit prices <br /> include, and is not limited to, 1-09.6 FORCE ACCOUNT, the Schedule of Values, or <br /> ' estimating manuals. <br /> 1-09.4(1) General <br /> (******) <br /> The following shall apply in determining the amount of an equitable adjustment of <br /> Contract Sum: <br /> 1. Except as otherwise expressly provided, Contractor will only be paid for costs <br /> ' it clearly and convincingly proves it actually and directly incurred, and shall <br /> not include consequential or indirect damages not otherwise expressly <br /> permitted by the Contract Documents. Costs and damages for which the <br /> ' City shall not be liable under any circumstances include, but are not limited <br /> to: (a) borrowing or interest costs, charges, or expenses of Contractor; (b) <br /> alleged lost profit or overhead on any other project; and (c) Contractor's <br /> ' failure or inability to obtain other work. <br /> 2. No Contract Claim for adjustment of Contract Sum or additional <br /> compensation for extra, affected, impacted or inefficient work will be allowed <br /> where the Contractor does not keep and maintain contemporaneous, <br /> ' complete and accurate time records for labor and equipment and <br /> contemporaneous, complete and accurate records for materials and where <br /> such records do not contemporaneously segregate and allocate by time, <br /> location and Work the time and costs for each item or element of such Work. <br /> Contractor's failure to keep and maintain such records constitutes a waiver of <br /> any Contract Claim or request by the Contractor for adjustment of Contract <br /> Sum for such costs or event. <br /> 3. To the extent the Contractor is entitled to an adjustment of Contract Sum due <br /> to any Delay or extension of Contract Time, Contractor shall be compensated <br /> ' as provided in 1-09.11A REMEDIES. Such compensation shall be full, <br /> adequate and complete compensation for all direct, indirect, cumulative, <br /> inefficiency, impact and ripple costs causing, arising out of, or relating to such <br /> Delays or extension. <br /> 4. Contractor and City agree that compensation to the Contractor for a Contract <br /> Claim shall not exceed the Contractor's costs based upon Force Account as <br /> described in 1-09.6 FORCE ACCOUNT. Contractor waives, releases, and <br /> ' agrees not to submit any request for adjustment of Contract Sum or Contract <br /> Claim based upon a "total cost" or "modified total cost" calculation, in whole or <br /> in part, but instead agrees that any and all requests for compensation shall be <br /> based upon accurate, complete and contemporaneous cost records that <br /> segregate and allocate costs (a) between base Contract work and the Work <br /> for which additional compensation is sought and (b) between each item of <br /> Work for which additional compensation is sought. Claims for inefficiency <br /> shall only be based and calculated by a comparison of productivity of similar <br /> Work performed in an unaffected or least affected area of the Project. <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—107 <br />