My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-09.12 Audits <br /> (******) <br /> 1-09.12(1) General <br /> The Contractor's records relating to this Project, including, but not limited to, wage, <br /> payroll, and cost records, shall be open to inspection or audit by representatives of the <br /> City during the Project and for a period of not less than six years after the date of Final <br /> Acceptance of the Contract. The Contractor shall retain these records for that period. <br /> The Contractor shall also guarantee that Project records of Subcontractors, suppliers, <br /> and lower tier subcontractors, including, but not limited to, the wage, payroll, and cost <br /> records, shall be retained and open to similar inspection or audit for the same period of <br /> time. The audit may be performed by employees or representatives of the City or by <br /> an auditor chosen by the City. The Contractor, Subcontractors, or lower tier <br /> subcontractors shall provide adequate facilities, reasonably acceptable to auditor, for <br /> the audit during normal business hours. The Contractor, Subcontractors, or lower tier <br /> subcontractors shall make a good faith effort to cooperate with the auditors. If an audit <br /> is to be commenced more than 60 calendar days after the Final Acceptance date of the <br /> Contract, the Contractor will be given 20 calendar days' notice of the time when the <br /> audit is to begin. If any litigation, claim, or audit arising out of, in connection with, or <br /> related to this Contract is initiated, the Project records shall be retained until the later of <br /> (a) completion of litigation, claim, or audit or (b) six years after the date of Final <br /> Acceptance. <br /> 1-09.12(2) Claims <br /> All Contract Claims filed against the City shall be subject to audit at any time following <br /> the filing of the Contract Claim. Failure of the Contractor, Subcontractors, or lower tier <br /> subcontractors to maintain and retain sufficient records to allow the auditors to verify <br /> all or a portion of the Contract Claim or to permit the auditor access to the books and <br /> records of the Contractor, Subcontractors, or lower tier subcontractors shall constitute <br /> a waiver of a Contract Claim and shall bar recovery in connection with the Contract. <br /> 1-09.12(3) Required Documents for Audits <br /> An audit may be performed by employees of the City or a representative of the City. <br /> The Contractor and its Subcontractors shall provide adequate facilities acceptable to <br /> the City for the audit during normal business hours. The Contractor and all <br /> Subcontractors shall cooperate with the City's auditors. <br /> As a minimum, the auditors shall have available to them the following documents: 1 <br /> 1. Daily time sheets and supervisor's daily reports. <br /> 2. Collective Bargaining Agreements. <br /> 3. Insurance, welfare, and benefit records. <br /> 4. Payroll registers. <br /> 5. Earnings records. <br /> 6. Payroll tax forms. <br /> 7. Material invoices and requisitions. <br /> 8. Material cost distribution worksheet. I <br /> 9. Equipment records (list of company equipment, rates, etc.) <br /> 10.Vendors', rental agencies', Subcontractors' and lower tier subcontractors' <br /> invoices. <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—122 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.