My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The hours eligible for "Traffic Control Labor" shall be for the hours actually worked, <br /> plus 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The <br /> labor to perform the Work described in the item "Maintenance and Protection of Traffic <br /> Control" is specifically excluded from this Work. No adjustment will be made to the unit <br /> price for "Traffic Control Labor"for overtime or holiday hours worked. <br /> 1-10.3(4)A Traffic Control - Off-Duty Police Officer <br /> Provide off-duty uniformed Police Officer for traffic control at all signalized <br /> intersections. Acceptable sources for off-duty uniformed Police Officers are as <br /> follows in order of preference: <br /> 1. City of Everett Police Department, contact either, <br /> a. Officer Mike Bernardi, (425) 327-9119 <br /> b. Officer Mike Drake, (425) 244-0025 <br /> 2. Puget Sound Executive Service, 625 B 5th Ave, Ste 4, Sequim, WA <br /> I 98382 <br /> a. Contact Nick Janssen, (360) 681-7737 <br /> 1-10.3(5) Construction Signs <br /> All signs required by the approved traffic control plan(s) as well as any other <br /> appropriate signs prescribed by the Engineer will be furnished by the Contractor and <br /> be paid under the item "Maintenance and Protection of Traffic Control." The Contractor <br /> shall erect them on posts or supports and maintain them in a clean, neat, and <br /> presentable condition until the necessity for them has ceased. All non-applicable signs <br /> shall be removed or covered with either metal or plywood during periods when they are <br /> not needed. When the need for any of these signs has ceased, the Contractor, upon <br /> approval of the Engineer, shall take down these signs, posts, or supports. All signs, <br /> posts, and supports shall be removed from the project and shall remain the property of <br /> the Contractor. <br /> There shall be no separate classification of signs. All construction signs, whether used <br /> throughout the construction, during a major phase of construction or removed daily <br /> shall be paid under the item "Maintenance and Protection of Traffic Control." Portable <br /> or temporary mountings may require added weight for stability. If it is necessary to add <br /> weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br /> bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br /> more than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1. Furnishing all construction signs. <br /> 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> 4. Furnishing labor and materials for maintaining the signs in a clean and <br /> presentable condition; <br /> 5. All other incidentals necessary for providing the construction signs according <br /> to the approved traffic control plan(s). <br /> 1 Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br /> to be unacceptable, while their use is required on the project, shall be replaced by the <br /> Contractor without additional compensation. <br /> 1 1-10.4 Measurement <br /> Delete 1-10.4 and substitute the following: <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—127 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.