My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> SPECIAL PROVISIONS <br /> I <br /> DIVISION 2 — EARTHWORK <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 2-02.1 Description <br /> Delete 2-02.1 and substitute the following: <br /> The Work shall consist of the removal, disposal or abandoning in-place of various <br /> existing improvements including, but not limited to, pavements, structures, pipe, curbs, <br /> curb and gutter, gutter, valves, manholes, catch basins and other items necessary for <br /> the accomplishment of the improvement. <br /> All Work with asbestos-cement pipe shall conform to the "Recommended Standard <br /> Asbestos-Cement Pipe Work Practice Procedure and Training Requirements," latest <br /> edition, as published by the American Water Works Association, Pacific Northwest <br /> Section. Remove and dispose of Asbestos-Cement pipe in accordance with the <br /> practices specified by the State of Washington Department of Ecology and the <br /> Snohomish County Solid Waste Division. <br /> 2-02.3 Construction Requirements <br /> 2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2) by adding the following: <br /> When removing structures such as manholes, inlets, or vaults that interfere with <br /> the construction, properly plug all pipe openings abandoned in-place watertight <br /> with Commercial Concrete, or with mortar and masonry, blocks or brick. <br /> Backfill voids with suitable job excavated material where structures are removed. <br /> Compact suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> Contractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling <br /> the voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, <br /> then providing Gravel Borrow or CDF for backfill shall be considered as Extra <br /> Work under 1-04.4. <br /> 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> Delete 2-02.3(3) and substitute the following: <br /> 2-02.3(3) Removal of Existing Street Improvements <br /> 2-02.3(3)A Description <br /> The Work shall consist of the removal and disposal of various existing <br /> improvements including, but not limited to, pavements, curb, curb and gutter, <br /> gutter and other items necessary for the accomplishment of the improvement. <br /> 2-02.3(3)B Removal of Pavement <br /> Remove full depth existing permanent type pavement and driveway pavement <br /> shown on the Plans or as directed by the Engineer. <br /> Replace, at no expense to the City, existing pavement designated to remain that is <br /> damaged during the pavement or concrete base removal. <br /> 2-02.3(3)B1 Sawcutting <br /> Make vertical full depth saw cut between existing asphalt concrete pavement <br /> to remain and the portion to be removed. <br /> Water Main Replacement"Q" Division 2-EARTHWORK February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.-UP3612 SP-131 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.