My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-02.3(7) Salvage <br /> (******) <br /> Carefully salvage and deliver to the Owner in good condition, all materials of <br /> recoverable value taken from the discarded facilities, unless otherwise indicated. <br /> Materials and things deemed of no value by the Engineer shall become the <br /> Contractor's property to be removed and properly disposed. <br /> Remove excess concrete, debris and dirt from castings and other materials the <br /> Engineer designates suitable for salvage and that are not to be re-used elsewhere on <br /> the Project. Deliver salvage castings and materials to the location designated by the <br /> Engineer. <br /> 2-02.3(8) Waste Disposal <br /> (******) <br /> Provide waste site for disposal of materials not required for construction. Arrange <br /> waste disposal at no expense to the City. Waste disposal shall meet the requirements <br /> of 2-03.3(7)C of the Standard Specifications. <br /> 2-02.3(9) Abandon Existing Water Valves In-place <br /> (******) <br /> Prior to abandoning existing water valves in-place, coordinate with City to have City <br /> forces close valve. After City forces verify valve is closed, remove valve box and <br /> extension, if any, and backfill with Gravel Borrow as specified in 9-03.14(1). Compact <br /> backfill to a minimum of 95 percent maximum density in accordance with 2-03.3(14)D. <br /> 2-02.4 Measurement <br /> Delete the first paragraph of 2-02.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> For curb and gutter cement removal with concrete pavement, the curb and gutter will <br /> be considered as pavement removal and the measurement for payment will be to the <br /> back of the curb. <br /> 2-02.5 Payment <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Include pavement, curb and gutter, and sidewalk removals with the construction of the <br /> water main, water service line, and hydrant lead work with no direct compensation <br /> being made. <br /> Include pipe abandonment with the construction of the respective water main, water <br /> service and hydrant lead work with no direct compensation being made. <br /> Include existing valve abandonment with the construction of respective water main, <br /> water service and hydrant lead work with no direct compensation made. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after <br /> completion of utility work. Grading for street reconstruction shall conform to COE <br /> Water Main Replacement"Q" Division 2-EARTHWORK February 9, 2018 <br /> - Evergreen Way Rebid <br /> WO No.—UP3612 SP-133 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.