SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> Make arrangements for disposal of surplus and other materials. All costs for <br /> disposal of surplus and other materials shall be included with the respective <br /> Bid items of the Contract with no direct compensation being made. <br /> Dispose of Asbestos-cement pipe in accordance with the requirements of the <br /> State of Washington Department of Ecology and the Snohomish County Solid <br /> Waste Division. <br /> 2-03.4 Measurement <br /> Delete all paragraphs under 2-03.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Items Descriptions and provided in Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-03.5 Payment <br /> Delete all paragraphs under 2-03.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for "Proof Rolling" as required in this <br /> section for excavated portions of the roadway and the Contractor shall include costs in <br /> his various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> Imported material required in this section shall be paid for by the unit Bid price for that <br /> material. Payment for placement and compaction of import material shall be included <br /> in the unit price per ton of import material. <br /> 2-04 HAUL <br /> 2-04.1 Description <br /> Delete the first paragraph of 2-04.1 and substitute the following: <br /> This Work shall consist of transporting excavated material from its original site to its <br /> final place on the Project or to a Contractor arranged waste site. <br /> 2-04.3 Vacant <br /> Delete 2-04.3 and substitute the following: <br /> 2-04.3 Construction Requirements <br /> Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br /> driveways, trails, sidewalks or parking lots not being improved in the Contract. <br /> 2-04.4 Measurement <br /> Haul work will not be measured. <br /> 2-04.5 Payment <br /> All costs for the Work described in Section 2-04 shall be included with excavation work with <br /> no direct compensation made. <br /> Water Main Replacement"Q" Division 2-EARTHWORK February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP-135 <br /> I <br />