i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Unless Engineer directs otherwise, provide Controlled Density Fill for fill above the <br /> i <br /> pipe zone for water main construction that is perpendicular to the travel lane in <br /> paved street sections. <br /> The Engineer may authorize the use of Gravel Borrow or suitable native material <br /> in non-paved areas. <br /> 7-09.3(12) General Pipe Installation <br /> Supplement 7-09.3(12) by adding the following: <br /> Provide minimum two inch red wide locator tape with wording "Earthquake <br /> Resistant Pipeline Below" between 12 and 18 inches directly above the <br /> Earthquake System piping. <br /> 7-09.3(13) Handling of Pipe <br /> Supplement 7-09.3(13) by adding the following: <br /> Supply water main pipe having ends plugged by manufacturer immediately after <br /> manufacturing to eliminate debris entrance into the pipe during shipping and <br /> storage. Leave plugs in place until installing pipe in trench. Failure to supply the <br /> debris plugs or to maintain the debris plugs until pipe installation may be cause for <br /> City to reject the pipe or require Contractor to disinfect the pipe in accordance with <br /> AWWA C651 and as witnessed by City Water Quality personnel prior to111 <br /> installation. <br /> Supplement 7-09.3(13) by adding the following: <br /> Touch up earthquake resistant pipe system pipe and component coatings using <br /> zinc-rich coating (85% zinc) in accordance with ICO-8179-part 2 as necessary <br /> prior to installing the polyethylene encasement. <br /> 7-09.3(17) Laying Ductile Iron Pipe With Polyethylene Encasement I <br /> Supplement 7-09.3(17) by adding the following: <br /> Encase Earthquake System piping in 8 mil V-Bio polyethylene encasement. <br /> 7-09.3(19) Connections <br /> 7-09.3(19)A Connections to Existing Mains <br /> Delete the last paragraph in 7-09.3(19)A and substitute the following: <br /> Only City Utilities Department personnel may make connections to existing <br /> water mains after successful pressure testing, disinfection and flushing. <br /> Schedule arrangements with the City Utilities Department a minimum of five <br /> business days in advance of making connections to the existing water main. <br /> Assemble necessary materials, equipment, and labor necessary to properly <br /> complete the Work prior to beginning the connection. <br /> Provide traffic control and expose the water main at the connection allowing <br /> sufficient room for COE forces to make connection, expose the water main at <br /> the connection, including properly shoring and sheeting the excavation in <br /> accordance with requirements of WISHA, RCW 49.17 including WAC 296- <br /> 155. Should City personnel determine the excavation and shoring and <br /> sheeting do not meet the requirements of WISHA, RCW 49.17, including <br /> WAC 296-155, City personnel will notify Contractor to make necessary <br /> modifications to bring the excavation and shoring into compliance prior to City <br /> personnel entering the trench. <br /> Repair damage to existing pipe caused by the Contractor's operations at <br /> Contractor's expense. <br /> Water Main Replacement"Q" Division 7—STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—152 , <br />