Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> ITABLE OF CONTENTS <br /> ADVERTISEMENT FOR BIDS 1 <br /> IDIVISION B - BID ITEM DESCRIPTIONS 3 <br /> SCHEDULE A—WATER MAIN 3 <br /> I SCHEDULE B — DRAINAGE 12 <br /> DIVISION P - PROPOSAL 17 <br /> BID SCHEDULE 19 <br /> IPROPOSAL SIGNATURE SHEET 22 <br /> SUBCONTRACTORS FORM 23 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 24 <br /> NON-COLLUSION AFFIDAVIT 25 <br /> BID DEPOSIT 26 <br /> I BID BOND 26 <br /> CONTRACT 29 <br /> PAYMENT BOND 33 <br /> IIPERFORMANCE BOND 35 <br /> DIVISION 1 — GENERAL REQUIREMENTS 37 <br /> I General Description and Location of Project (******) 37 <br /> Design Engineer (******) 37 <br /> Standard Specifications (******) 37 <br /> I 1-01 DEFINITIONS AND TERMS 38 <br /> 1-01.3 Definitions 38 <br /> 1-02 BID PROCEDURES AND CONDITIONS 42 <br /> I 1-02.1 Prequalifications of Bidders 42 <br /> 1-02.1 Bidder Responsibility Criteria (******) 42 <br /> 1-02.2 Plans and Specifications 42 <br /> 1 1-02.4 Examination of Plans, Specifications, and Site of Work 43 <br /> 1-02.5 Proposal Form 44 <br /> 1-02.6 Preparation of Proposal 44 <br /> I1-02.7 Bid Deposit 45 <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification 45 <br /> 1-02.9 Delivery of Proposal 46 <br /> I1-02.10 Withdrawaling, Revising, or Supplementing Proposal 46 <br /> 1-02.12 Public Opening of Proposals 46 <br /> 1-02.13 Irregular Proposals 46 <br /> I1-02.14 Disqualification of Bidders 47 <br /> 1-02.15 Pre-Award Information 47 <br /> I1-03 AWARD AND EXECUTION OF CONTRACT 47 <br /> Watermain Replacement"0" Table of Contents - February 9,2018 <br /> -Evergreen Way Rebid <br /> IWO No.—UP3612 SP-i <br /> 1 <br />