My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> ITABLE OF CONTENTS <br /> ADVERTISEMENT FOR BIDS 1 <br /> IDIVISION B - BID ITEM DESCRIPTIONS 3 <br /> SCHEDULE A—WATER MAIN 3 <br /> I SCHEDULE B — DRAINAGE 12 <br /> DIVISION P - PROPOSAL 17 <br /> BID SCHEDULE 19 <br /> IPROPOSAL SIGNATURE SHEET 22 <br /> SUBCONTRACTORS FORM 23 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 24 <br /> NON-COLLUSION AFFIDAVIT 25 <br /> BID DEPOSIT 26 <br /> I BID BOND 26 <br /> CONTRACT 29 <br /> PAYMENT BOND 33 <br /> IIPERFORMANCE BOND 35 <br /> DIVISION 1 — GENERAL REQUIREMENTS 37 <br /> I General Description and Location of Project (******) 37 <br /> Design Engineer (******) 37 <br /> Standard Specifications (******) 37 <br /> I 1-01 DEFINITIONS AND TERMS 38 <br /> 1-01.3 Definitions 38 <br /> 1-02 BID PROCEDURES AND CONDITIONS 42 <br /> I 1-02.1 Prequalifications of Bidders 42 <br /> 1-02.1 Bidder Responsibility Criteria (******) 42 <br /> 1-02.2 Plans and Specifications 42 <br /> 1 1-02.4 Examination of Plans, Specifications, and Site of Work 43 <br /> 1-02.5 Proposal Form 44 <br /> 1-02.6 Preparation of Proposal 44 <br /> I1-02.7 Bid Deposit 45 <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification 45 <br /> 1-02.9 Delivery of Proposal 46 <br /> I1-02.10 Withdrawaling, Revising, or Supplementing Proposal 46 <br /> 1-02.12 Public Opening of Proposals 46 <br /> 1-02.13 Irregular Proposals 46 <br /> I1-02.14 Disqualification of Bidders 47 <br /> 1-02.15 Pre-Award Information 47 <br /> I1-03 AWARD AND EXECUTION OF CONTRACT 47 <br /> Watermain Replacement"0" Table of Contents - February 9,2018 <br /> -Evergreen Way Rebid <br /> IWO No.—UP3612 SP-i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.