My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> lifts of HMA — CL 1/2" PG 64-22 pavement including streets, alleys, street crossings, and <br /> driveway aprons as shown on the Plans. <br /> Miscellaneous HMA used for pavement repair, thickened edges, extruded and wedge <br /> curbing, placing and compacting pre-leveling, leveling and wearing courses, feathering <br /> pavement is included in this bid item with no direct compensation made. <br /> Furnishing and applying tack coat, prime coat, joint seal and crack sealing asphalt is to be <br /> included in this bid item with no direct compensation made. All costs for "Anti Stripping <br /> Additive" and "Compaction Adjustment" shall be included in the unit contract price per ton of <br /> the HMA with no direct compensation made. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, place, compact, roll and perform density tests on ATB placed in <br /> 111 accordance with the Plans, Standard Specifications, and these Special Provisions. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS February 9,2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP -15 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.