My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> I the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BID SCHEDULE <br /> 1 BIDDER: c V C.CnS- tcrh On i ( Y1 C.. <br /> Tte ITEM DESCRIPTION Unit Qty UNIT PRICE TOTAL AMOUNT <br /> Schedule A- Evergreen Way Water Main <br /> I1 Mobilization LS 1 A DO0 . $ 1M, 000 <br /> I <br /> 2 SPCC Plan LS 1 $ 301) . $ 3DV <br /> 3 Force Account FA 1 $ 55,000.00 $ 55,000.00 <br /> I4 Traffic Control Labor HR 500 $ lot $ 301 S 00 <br /> I5 Traffic Control-Off-Duty Police Officer FA 1 $ 2,200.00 $ 2,200.00 <br /> 6 Maintenance and Protection of Traffic Control LS 1 $2.1,25. $ 2,112.-15 <br /> 7 Trench Excavation Safety Systems LS 1 $ 41400 . $ 41 ID01) <br /> 1 8 Street Cleaning&Sweeping HR 50 $ 110 ._ $ x%500 <br /> I 9 Erosion/Water Pollution Control FA 1 $ 2,100.00 $ 2,100.00 <br /> Sawcutting Asphalt Concrete Pavement, Final <br /> 10 Joint Cut up to 6-in LF 5100 $ 3 .4p $ V1134'0 <br /> I Sawcutting Asphalt Concrete Pavement, Final <br /> 11 Joint Cut additional 1-in thickness LF 10200 $ .9P $ °1, n <br /> — <br /> Sawcutting Concrete Pavement, Final Joint Cut <br /> I12 up to 6-in LF 200 $ 11 T $ 2.1 ZOIb <br /> 13 Foundation Material, Class A or B TON 470 $ 55 _ $ 2-Cr 450 <br /> I14 Gravel Borrow TON 1100 $ 2-i $ 2-°11-10t) <br /> Earthquake Resistant Ductile Iron Pipe System <br /> 1 15 for Water Main, 12-Inch Diam. LF 2540 $ 2-010 . $ 5n,21-10 16 Gate Valve, 6-Inch EA 2 $ 4150 . 10'0 <br /> 1 10'o .T <br /> I17 Gate Valve, 8-Inch EA 1 $ 1 fiO $ 1i D <br /> Water Main Replacement"Q" Division P—PROPOSAL March 14,2018 <br /> -Evergreen Way Rebid Addendum 2 <br /> Work Order No.—UP3612 SP—19 <br /> DI 3 <br /> provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.