My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Item <br /> I <br /> No. ITEM DESCRIPTION Unit UNIT PRICE TOTAL AMOUNT <br /> Qty <br /> I <br /> 38 Vehicle Loop Detectors LF 720 $ 3Z _ $ 21 c' lsb —__ <br /> Subtotal Base Bid $ It 2ni141 .__ <br /> ' o <br /> _ WA State Sales Tax @ 9.7% $ 1 -M,251 .°W <br /> IBase Bid Total $ II 405,191 !Ale <br /> Schedule B -Storm Drainage <br /> IStorm Drainage Structure Removal/Pipe <br /> 39 Replacement EA 5 $2 2 Si) ._ $ \'12S 0 <br /> I Storm Drainage Structure Removal/Tee <br /> 40 Replacement EA 4 $ 3 . $ V3,200 <br /> 41 Catch Basin, Type 1 EA 1 $ 195 $ I,°1°15 <br /> 4 Fri, Sawcutting Asphalt Concrete Pavement, Final <br /> 42 Joint Cut up to 6-in LF 120 $7 8 .51) $ X 102.4 _ <br /> I Sawcutting Asphalt Concrete Pavement, Final <br /> 43 Joint Cut additional 1-in thickness LF 120 $ ( .50 $ 170 <br /> Sawcutting Concrete Curb and Gutter and <br /> 44 Sidewalk, Final Joint Cut LF 20 $ 419 . $ 1,35'0 <br /> I45 Temporary Pavement Patch SY 50 $ 2'3 _ I l5� <br /> HMA, CL 1/2" PG 64-22 Permanent Trench <br /> I <br /> 46 Patch TON 30 $ 335 $ IO1O50 <br /> 47 Cement Concrete Sidewalk Restoration SY 20 $ ILI5 $ cZ., `00 <br /> I48 Cement Concrete Curb and Gutter, Type 1 LF 20 $ 110 $ 212.00 <br /> I <br /> Schedule B Bid Total $ L1 5 25 <br /> SUMMARY <br /> ISchedule A Total brought forward $ \140S11°1°1 ,CIV <br /> ISchedule B Total brought forward $ 4S,325 <br /> TOTAL BASE BID $-\M5o,SZy , qu <br /> IThe bid items above are described further in Division B—Bid Items Descriptions. <br /> IWater Main Replacement"Q" Division P—PROPOSAL March 14, 2018 <br /> -Evergreen Way Rebid Addendum 2 <br /> Work Order No.—UP3612 SP—21 <br /> 11 5 <br /> D ded to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com -Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.