Laserfiche WebLink
I <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> ISUBCONTRACTORS FORM <br /> I 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical <br /> work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the <br /> chart below. If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> WORK". <br /> I 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> I 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails (1) to <br /> submit as part of the Bid the names of such Subcontractors, (2) to name itself to perform such <br /> I B. Work, or(3)to write "No Work"; or <br /> Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> I plumbing, and electrical subcontractors who will contract directly with the genera] contractor <br /> submitting the Bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> I HEATING Subcontractor, bidder or"no work" <br /> MUST be stated n0 woo_ <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work"MUST be no Wpr11C. <br /> I stated <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work"MUST be fb tNQY\L- <br /> I stated <br /> ELECTRICAL (as described in RCW Chap. -Trane <br /> 19.28) -3Z 4 Innot kW. E"" <br /> Subcontractor, bidder or "no work" MUST be <br /> I <br /> stated Slowly('Wei °vim <br /> I <br /> I <br /> I <br /> I <br /> Water Main Replacement"Q" Division P—PROPOSAL February 9,2018 <br /> I -Evergreen Way Rebid <br /> Work Order No.—UP3612 SP—23 <br /> � <br /> 'a33 Subcontractors Form <br /> 'r ded to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />