Laserfiche WebLink
I <br /> CITY OF EVERETT, WASHINGTON <br /> ICONTRACT <br /> THIS CONTRACT is made and entered into this /i <br /> -01 day of ()pp,L , 2018, by and between <br /> I the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> Washington, hereinafter called the "City," and <br /> SRV Cot Si- N <br /> QVC7�QjZNC. a <br /> 1,0A.S1.46-101-1 Cot",PaR L�(WN , hereinafter called the "Contractor." <br /> IIIn consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct and to build <br /> and construct in a workmanlike manner the work, improvements, and appurtenances in accordance with <br /> I the Specifications and Plans entitled: WATER MAIN REPLACEMENT "Q" — EVERGREEN WAY <br /> REBID UP3612 (the "Project"). <br /> I 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders (if any) <br /> I C. Washington State Department of Transportation Standard Specifications 2016 as <br /> modified by all amendments thereto as of the date of bid opening of this Project <br /> ("Standard Specifications"). <br /> ID. Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> $ F. Addenda(if any) <br /> G. Payment Bond and Performance Bond <br /> IH. Contractor's Proposal/Bid(conformed copy dated 3",a .. .o 18" ) <br /> II. All provisions required by law whether set forth and reproduced herein or not <br /> 2. Time for Completion. Substantial completion shall be achieved within 100 working days of the <br /> effective date of the Notice to Proceed. Physical completion shall be within 20 working days of the <br /> Iactual date of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> I expense in the event that the Contractor does not complete the work in all respects and have it ready for <br /> use by the substantial completion date stated. Because it is difficult to accurately compute the amount of <br /> such costs and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages as computed in Section 1-08.9 of the Standard Specifications, for each and every working day <br /> I required to accomplish substantial completion of the work in excess of the period established above for <br /> substantial completion. For overruns in contract time occurring after the physical completion date, <br /> liquidated damages shall be assessed at the rate of ten percent(10%) of the amount computed in Section <br /> 1 1-08.9 of the Standard Specifications until the work is physically complete. <br /> 4. Contract Amount. The amount of this Contract is 1 I H50 5,;14„�6 <br /> I ($ ) and is based on the proposal/?id submitted by Contractor dated <br /> WATER MAIN REPLACEMENT"Q" Division C -CONTRACT February 9, 2018 <br /> -Evergreen Way Rebid <br /> IWork Order# UP3612 SP—29 <br />