My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> 2-09.3 Construction Requirements 136 <br /> I 2-09.4 Measurement 137 <br /> 2-09.5 Payment 137 <br /> 2-11 TRIMMING AND CLEANUP 137 <br /> I 2-11.3 Construction Requirements 137 <br /> 2-11.4 Measurement 138 <br /> 2-11.5 Payment 138 <br /> IDIVISION 4 - BASES 139 <br /> 4-04 BALLAST AND CRUSHED SURFACING 139 <br /> 4-04.1 Description 139 <br /> 4-04.3 Construction Requirements 139 <br /> 4-04.4 Measurement 139 <br /> I <br /> 4-04.5 Payment 139 <br /> 4-06 ASPHALT TREATED BASE 139 <br /> 4-06.4 Measurement 140 <br /> I 4-06.5 Payment 140 <br /> DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 141 <br /> 5-06 PAVEMENT PATCHING (******) 141 <br /> II 5-06.1 Description 141 <br /> 5-06.2 Materials 141 <br /> 5-06.3 Construction Requirements 141 <br /> 1 5-06.4 Measurement 143 <br /> 5-06.5 Payment 143 <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER <br /> IMAINS, AND CONDUITS 145 <br /> 7-04 STORM SEWERS 145 <br /> 7-04.1 Description 145 <br /> 7-04.2 Materials 145 <br /> 7-04.4 Measurement 145 <br /> I 7-04.5 Payment 145 <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS 146 <br /> 7-05.1 Description 146 <br /> I 7-05.2 Materials 146 <br /> 7-05.3 Construction Requirements 146 <br /> 7-05.4 Measurement 147 <br /> I 7-05.5 Payment 147 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 147 <br /> 7-08.1 Description 147 <br /> 7-08.2 Materials 147 <br /> 7-08.3 Construction Requirements 147 <br /> 7-08.4 Measurement 149 <br /> 1 7-08.5 Payment 149 <br /> Watermain Replacement"Q" Table of Contents - February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.- UP3612 SP -v <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.