My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> performed by the Contractor shall be done at its risk unless authorized by the <br /> City's Representative and approved by the City. <br /> 1-04.1(3)C(2) Conflicting Provisions <br /> In the event an item of Work is described differently in two or more locations <br /> on the Plans, in the Specifications and Special Provisions, the Contractor <br /> shall, upon request of the City's Representative, submit in writing to the City's <br /> Representative the description upon which the Contractor relied in preparing <br /> its Bid or laying out the Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> ' The City has endeavored to determine the existence of public and private <br /> utilities at the site of the Work from the records of the owners of known <br /> utilities in the vicinity of the Work. The positions of these utilities as derived <br /> ' from such records are shown on the Plans. Unless otherwise noted, no <br /> excavations were made to verify the locations shown for underground utilities. <br /> The service connections to the gas, electric, cable TV and communication <br /> utilities are not shown on the Plans. Refer to 1-07.17 UTILITIES AND <br /> SIMILAR FACILITIES regarding Contractor's responsibility for locating and <br /> verifying underground public and private utilities. <br /> 1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br /> ' When a utility interferes with the Work and is either (1) not identified on the <br /> Plans or (2) located in a position significantly different from that specified on <br /> the Plans or in accordance with a particular utility's standard depth and <br /> ' location, Contractor shall follow the procedures of 1-04.7 DIFFERING SITE <br /> CONDITIONS (CHANGED CONDITIONS). Interference with the Work is <br /> defined as a utility that crosses or projects into the plane of the Work at an <br /> elevation between the top and bottom of the Work. <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br /> Specifications, and Addenda <br /> ' Revise the second paragraph of 1-04.2 to read as follows: <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order <br /> of precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> 3. Contract, <br /> 4. Proposal Form, <br /> 5. Special Provisions, <br /> 6. Contract Plans, <br /> 7. City's Standard Drawings (if any) <br /> 8. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br /> Construction, <br /> 9. Amendments to WSDOT Standard Specifications for Road, Bridge, and <br /> Municipal Construction, and <br /> ' 10.WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.