My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> days, commencing on the date of Final Acceptance, the Contractor shall, upon the <br /> receipt of Notice in writing from the City, promptly make all repairs arising out of , <br /> defective materials, workmanship, or Equipment at no cost to the City. The City is <br /> hereby authorized to make such repairs if, fourteen (14) calendar days after giving of <br /> such Notice to the Contractor, the Contractor has failed to make or undertake the <br /> repairs with due diligence. In case of an emergency where, in the opinion of the City, 111 <br /> delay could cause serious loss or damage, repairs may be made prior to or concurrent <br /> with Notice being sent to the Contractor. All expenses in connection with such repairs <br /> will be charged to the Contractor. 111 <br /> "Acceptance of the Work" shall not extinguish any covenant or agreement on the part <br /> of the Contractor to be performed or fulfilled under this Contract that has not, in fact, <br /> been performed or fulfilled at the time of such acceptance. All covenants and I <br /> agreements shall continue to be binding on the Contractor until they have been <br /> fulfilled. <br /> The City and the Contractor agree that the guarantee on the completed portions of the <br /> 111 <br /> Work possessed and used by the City shall commence as to those portions on the <br /> date that the City takes possession of those portions and so notifies the Contractor in <br /> writing. City and Contractor further agree that such taking possession and use shall <br /> not be deemed as acceptance of the Work. Takeover of completed portions of the <br /> Work shall be at the City's option and will not be made until the Work can be put into <br /> routine service on a permanent basis. <br /> The guarantee provided herein shall be in addition to those specific guarantee or <br /> warranty requirements for particular Equipment or Work items, or both, as indicated in <br /> the Specifications and Special Provisions. <br /> 1-05.11 Final Inspection <br /> Delete 1-05.11 and substitute the following: <br /> 1-05.11 Final Inspections and Operational Testing <br /> (******) <br /> 1-05.11(1) Substantial Completion Date <br /> When the Contractor considers the Work to be substantially complete, the Contractor <br /> shall so notify the Engineer and request the Engineer establish the Substantial <br /> Completion Date. The Contractor's request shall list the specific items of Work that <br /> remain to be completed in order to reach physical completion. The Engineer will <br /> schedule an inspection of the Work with the Contractor to determine the status of <br /> completion. The Engineer may also establish the Substantial Completion Date <br /> unilaterally. <br /> If, after this inspection, the Engineer concurs with the Contractor that the Work is <br /> substantially complete and ready for its intended use, the Engineer, by written notice to <br /> the Contractor, will set the Substantial Completion Date. If, after this inspection the <br /> Engineer does not consider the Work substantially complete and ready for its intended <br /> use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br /> therefore. <br /> Upon receipt of written notice concurring in or denying substantial completion, I <br /> whichever is applicable, the Contractor shall pursue vigorously, diligently and without <br /> unauthorized interruption, the Work necessary to reach Substantial and Physical <br /> Completion. The Contractor shall provide the Engineer with a revised schedule <br /> indicating when the Contractor expects to reach substantial and physical completion of <br /> the Work. <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—64 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.