Laserfiche WebLink
1 <br /> 2 8-09.4 Measurement <br /> 3 <br /> 4 Section 8-09.4 is supplemented with the following: <br /> 5 <br /> 6 Measurement of markers will be per hundred for markers furnished and in place. <br /> 7 <br /> 8 8-09.5 Payment <br /> 9 <br /> 10 Section 8-09.5 is supplemented with the following: <br /> 11 <br /> 12 Payment will be made in accordance with section 1-04.1, for the following Bid item <br /> 13 included in the Proposal: <br /> 14 <br /> 15 "Raised Pavement Marker Type 2", per hundred. <br /> 16 <br /> 17 <br /> 18 GLF 8-13.DOCX <br /> 19 8-13 MONUMENT CASES <br /> 20 <br /> 21 Section 8-13 of the standard specifications is deleted and replaced by the following: <br /> 22 <br /> 23 (******) <br /> 24 8-13.1 Description <br /> 25 <br /> 26 This work will consist of adjusting existing survey monument cases to grade in <br /> 27 accordance with Standard Drawing No. 323 and these Special Provisions. <br /> 28 <br /> 29 8-13.2 Vacant <br /> 30 <br /> 31 8-13.3 Construction Requirements <br /> 32 <br /> 111 <br /> 33 Existing monument castings shall be adjusted to grade in the same manner as for <br /> 34 manholes in Section 7-05.3(1) of these Special Provisions. <br /> 35 <br /> 36 8-13.4 Measurement 111 <br /> 37 <br /> 38 Measurement of monument case and cover will be by the unit for each monument case <br /> 39 and cover adjusted to grade. <br /> 40 <br /> 41 8-13.5 Payment <br /> 42 <br /> 43 Payment will be made for the following bid items when included in the proposal: <br /> 44 <br /> 45 "Adjust Existing Monument Castings to Grade," per each; <br /> 46 <br /> 47 The unit contract price for "Adjust Existing Monument Casing to Grade" shall include all <br /> 48 costs to adjust the casting to finished grade. <br /> 49 <br /> 50 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 46 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />