My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> BID PROPOSAL <br /> ICITY OF EVERETT, WASHINGTON <br /> I HOT MIX ASPHALT OVERLAY - 2018 <br /> W.O. #3667 <br /> Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between <br /> I the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br /> conform thereto. All entries must be typed or entered in ink. <br /> 1 BASIC BID ITEMS <br /> BIDDER NAME <br /> I <br /> ITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT <br /> NO. QUANTITY (Figures) (Figures) <br /> I <br /> 1. 1 Mobilization <br /> ILump Sum Per LS <br /> I2. 5,339 Flaggers (Minimum Bid Prevailing Wage) . <br /> Hour Per Hour <br /> I <br /> 3. 1 Project Temporary Traffic Control _ . <br /> ILump Sum Per LS <br /> 4. 16,873 HMA Class 1/2 Inch, PG 64-22 <br /> Ton Per Ton <br /> I <br /> 5. 141 Adjust Manhole to Grade . <br /> IEach Per Each <br /> I6. 52 Adjust Catch Basin/Inlet to Grade . <br /> Each Per Each <br /> I <br /> 7. 73 Adjust Valve Box to Grade <br /> IEach Per Each <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 3 OF 14 MARCH 6, 2018 <br /> WORK ORDER#3667 <br /> IDIVISION P <br />
The URL can be used to link to this page
Your browser does not support the video tag.