Laserfiche WebLink
MI MB EN - NM 6 MI S EN - N i M - - I E M E <br /> I I <br /> 0 W9-3 W20-1 <br /> WITH <br /> CENTER ROAD <br /> ROLL SPACING WORK :2*(3 <br /> UNE <br /> CLOSED WORK <br /> (MIN 50'MAX100') TRUCK EAD AHEAD <br /> WITH BUFFER SPACE <br /> FLASHING SEE TABLE A TAPER LENGTH <br /> BEACON (SEE TABLE A) 200' 200' <br /> WORK AREA <br /> — — — — — — ®--0=41j—t@i—C2 -Q-Ig_- = is U E2 - — — — — — — — — -- -- — — <br /> qtr —129 14- 141—® -14— _lit_Lif=- =ice— —®_®' <br /> aap- <br /> 200' H 200' TAPER LENGTH _ _ <br /> (SEE TABLE A) <br /> Ct 20'MIN WORK SITE <br /> ROAD CENTER &TYPE 2 BARRICADE <br /> WORK CLOSED NOTES LEGEND <br /> AHEAD EAD <br /> WITH 1. DISTANCE BETWEEN SIGNS SHALL BE 100'FOR ll CONE OR CHANNELIZING DEVICE SEE STANDARD <br /> 1 RESIDENTIAL STREETS(25 MPH)AND 350'FOR DRAWING 713. <br /> W20-1 W9-3 ARTERIAL ROADWAYS <br /> 30 <br /> a 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR <br /> NIGHT-TIME USE(OPTIONAL). <br /> 1 <br /> 3 3. DISTANCES MAY VARY AS APPROVED BY THE <br /> t ENGINEER. <br /> TABLE A 4. SPOTTERS REQUIRED WHENEVER THE CONTRACTOR <br /> SPEED CONE SPACING BUFFER <br /> MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE <br /> (MPH) (Fr) SPACING WORK SITE WITH MATERIALS OR EQUIPMENT <br /> (FLAGGING REQUIRES 3 OR 4 SIGN SETUP). <br /> O TANGENT TAPER (FT) <br /> 0 25 25 55 5. SIGN SIZE PER MUTCD. CITY OF EVERETT <br /> a 30 30 85 6. THIS PLAN IS PROVIDED ASA GUIDE ONLY.FOR EVE Err <br /> PUBLIC WORKS DEPARTMENT <br /> 35 35 20 120 SPECIFIC INFORMATION ON TRAFFIC CONTROL PLANS <br /> o SEE CURRENT MUTCD. " I5As3 IcoaEVH�'�ar I PAUiwaHEua I°"ISH <br /> 40 40 170 m TRAFFIC CONTROL PLAN 0222872018 <br /> 45 45 220 <br /> is 5 LANE ROADWAY WITH 711 <br /> i, TWO WAY LEFT TURN LANE CLOSURE <br /> I I <br />