My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 18 I <br /> Operator/Technician 1 <br /> Snohomish Divers &Tenders Remote Operated Vehicle $57.43 5A 4C <br /> Tender <br /> 111 <br /> Snohomish Dredge Workers Assistant Engineer $56.44 5D 3F <br /> Snohomish Dredge Workers Assistant Mate (Deckhand) $56.00 5D 3F <br /> Snohomish Dredge Workers Boatmen $56.44 5D 3F I <br /> Snohomish Dredge Workers Engineer Welder $57.51 5D 3F <br /> Snohomish Dredge Workers Leverman, Hydraulic $58.67 5D 3F <br /> Snohomish Dredge Workers Mates $56.44 5D 3F <br /> Snohomish Dredge Workers Oiler $56.00 5D 3F <br /> Snohomish Drywall Applicator Journey Level $56.78 5D 1H <br /> Snohomish Drywall Tapers Journey Level $57.43 5P 1E # <br /> Snohomish Electrical Fixture Maintenance Journey Level $13.76 1 <br /> Workers <br /> Snohomish Electricians - Inside Cable Splicer $68.09 7H 1E <br /> Snohomish Electricians - Inside Construction Stock Person $33.86 7H 1D <br /> Snohomish Electricians - Inside Journey Level $63.61 71-1 1 E I <br /> Snohomish Electricians - Motor Shop Craftsman $15.37 1 <br /> Snohomish Electricians - Motor Shop Journey Level $14.69 1 <br /> Snohomish Electricians - Powerline Cable Splicer $73.93 5A 4D <br /> Construction <br /> Snohomish Electricians - Powerline Certified Line Welder $67.60 5A 4D <br /> Construction <br /> Snohomish Electricians - Powerline Groundperson $45.49 5A 4D <br /> Construction <br /> Snohomish Electricians - Powerline Heavy Line Equipment $67.60 5A 4D <br /> Construction Operator <br /> Snohomish Electricians - Powerline Journey Level Lineperson $67.60 5A 4D <br /> Construction <br /> Snohomish Electricians - Powerline Line Equipment Operator $57.02 5A 4D <br /> Construction <br /> Snohomish Electricians - Powerline Pole Sprayer $67.60 5A 4D <br /> Construction <br /> Snohomish Electricians - Powerline Powderperson $50.76 5A 4D <br /> Construction <br /> Snohomish Electronic Technicians Journey Level $30.10 1 <br /> Snohomish Elevator Constructors Mechanic $88.36 7D 4A <br /> Snohomish Elevator Constructors Mechanic In Charge $95.41 7D 4A <br /> Snohomish Fabricated Precast Concrete Journey Level - In-Factory $13.50 1 i <br /> Products Work Only <br /> Snohomish Fence Erectors Fence Erector $14.00 1 <br /> Snohomish Flaggers Journey Level $39.48 7A 31 <br /> Snohomish Glaziers Journey Level $60.56 7L 1Y <br /> Snohomish Heat & Frost Insulators And Journeyman $67.93 5J 411 <br /> Asbestos Workers <br /> Snohomish Heating Equipment Mechanics Journey Level $78.17 7F 1E <br /> Snohomish Hod Carriers & Mason Tenders Journey Level $48.02 7A 31 <br /> https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 2/27/2018 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.