My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT, WASHINGTON <br /> ICONTRACT PROVISIONS FOR <br /> HOT MIX ASPHALT OVERALY - 2018 <br /> WORK ORDER #3667 <br /> NOTICE TO CONTRACTORS <br /> Notice is hereby given that sealed proposals for the Hot Mix Asphalt Overlay - 2018 project will be <br /> received at the office of the City Clerk, 1st Floor Wall Street Building, 2930 Wetmore, Everett, <br /> Washington 98201, until 2:00 p.m., on Tuesday, March 27. <br /> At the appointed time, all bids will be opened and publicly read aloud in the Public Hearing Room on <br /> the 8th Floor of the Wall Street Building. <br /> The engineer's estimate for this project is $2,891,589. <br /> The work includes, but is not limited to: The construction of approximately 16,873 tons of Hot Mix <br /> Asphalt, Class 1/2" PG 64-22 two inches (2") thick, on selected City streets, including grinding, utility <br /> adjustments, striping, channelization, traffic induction loops, and other work as maybe necessary for <br /> the completion of the project, as described more completely, in the plans, specifications, and contract <br /> documents, Entitled "City of Everett, Washington, Plans and Specifications for "Hot Mix Asphalt <br /> Overlay - 2018". <br /> Attention is called to "Lane Restrictions" for each location of work in section 1-07.23(1) of the special <br /> provisions. <br /> Questions and inquiries about the Contract Provisions should be directed to the attention of Gael L. <br /> Fisk, P.E., (425) 257 — 8909 or gfisk@everettwa.gov. <br /> Plans, specifications, addenda, and plan holders list for this project may be viewed on line at <br /> https://everettwa.gov/bids. Plan sets may also be purchased for the cost of reproduction at Bill's <br /> Blueprint (425) 259-0859 at 2920 Rockefeller Avenue, Everett, WA 98201. <br /> The City reserves the right to reject any and all bids and waive any irregularities or informalities. No <br /> bidder may withdraw his bid after the hour set for the opening thereof. The City further reserves the <br /> right to make the bid award as deemed in the best interest of the City. The right is reserved by the <br /> City to postpone the award for a period of forty-five (45) days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations <br /> pertaining to equal employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Dated at Everett, Washington. <br /> SHARON FULLER, CITY CLERK <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.