Laserfiche WebLink
1 1 <br /> 2 6-02.3(4)D Temperature and Time For Placement <br /> 1 3 The following is inserted after the first sentence of the first paragraph: <br /> 4 <br /> 5 The upper temperature limit for placement for Class 4000D concrete may be increased <br /> I 6 to a maximum of 80°F if allowed by the Engineer. <br /> 7 <br /> 8 6-02.3(6)A1 Hot Weather Protection <br /> I 9 The first paragraph is revised to read: <br /> 10 <br /> 11 The Contractor shall provide concrete within the specified temperature limits. Cooling of <br /> I 12 the coarse aggregate piles by sprinkling with water is permitted provided the moisture <br /> 13 content is monitored, the mixing water is adjusted for the free water in the aggregate <br /> 14 and the coarse aggregate is removed from at least 1 foot above the bottom of the pile. <br /> 15 Sprinkling of fine aggregate piles with water is not allowed. Refrigerating mixing water or <br /> 16 replacing all or part of the mixing water with crushed ice is permitted, provided the ice is <br /> 17 completely melted by placing time. <br /> 18 <br /> I 19 The second sentence of the second paragraph is revised to read: <br /> 20 <br /> 21 These surfaces include forms, reinforcing steel, steel beam flanges, and any others that <br /> I 22 touch the concrete. <br /> 23 <br /> 24 6-02.3(10)D5 Bridge Deck Concrete Finishing and Texturing <br /> I 25 in the third subparagraph of the first paragraph, the last sentence is revised to read: <br /> 26 <br /> 27 The Contractor shall texture the bridge deck surface to within 3-inches minimum and <br /> I 28 24-inches maximum of the edge of concrete at expansion joints, within 1-foot minimum <br /> 29 and 2-feet maximum of the curb line, and within 3-inches minimum and 9-inches <br /> 30 maximum of the perimeter of bridge drain assemblies. <br /> I 31 <br /> 32 6-02.3(13)A Strip Seal Expansion Joint System <br /> 33 In item number 3 of the third paragraph, "Federal Standard 595" is revised to read "SAE <br /> II 34 AMS Standard 595". <br /> 35 <br /> 36 6-02.3(24)C Placing and Fastening <br /> 1 37 The fourth sentence of the second paragraph is revised to read: <br /> 38 <br /> 39 All epoxy-coated bars in the top mat of the bridge deck shall be tied at all intersections, <br /> 40 however they may be tied at alternate intersections when spacing is less than 1 foot in <br /> 1 41 each direction and they are supported by continuous supports meeting all other <br /> 42 requirements of supports for epoxy-coated bars. <br /> 43 <br /> I 44 The sixth paragraph (excluding the numbered list) is revised to read: <br /> 45 <br /> 46 Precast concrete supports (or other accepted devices) shall be used to maintain the <br /> I 47 concrete coverage required by the Plans. The precast concrete supports shall: <br /> 48 <br /> 49 Item number 2 of the sixth paragraph is revised to read: <br /> I 50 <br /> 51 2. Have a compressive strength equal to or greater than that of the concrete in which <br /> 52 they are embedded. <br /> 1 53 <br /> 54 The first sentence of the seventh paragraph is revised to read: <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 15 OF 53 March 6,2018 <br /> I WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />