My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 7-09.AP7 <br /> 2 Section 7-09, Water Mains <br /> 3 April 3, 20171 <br /> 4 7-09.3(24)D Dry Calcium Hypochlorite <br /> 5 The second paragraph is revised to read: <br /> 6 <br /> 7 The number of grams of 70 percent test calcium hypochlorite required for a 20-foot <br /> 8 length of pipe equals 0.238 x d2, in which "d" is the diameter in inches. <br /> I <br /> 9 <br /> 10 8-01.AP8 <br /> 11 Section 8-01, Erosion Control and Water Pollution Control <br /> 12 January 11, 2018 <br /> 13 8-01.1 Description <br /> 14 This section is revised to read: <br /> 15 <br /> 16 This Work consists of furnishing, installing, maintaining, removing and disposing of best <br /> 17 management practices (BMPs), as defined in the Washington Administrative Code <br /> 18 (WAC) 173-201A, to manage erosion and water quality in accordance with these <br /> 19 Specifications and as shown in the Plans or as designated by the Engineer. <br /> I <br /> 20 <br /> 21 The Contracting Agency may have a National Pollution Discharge Elimination System <br /> 22 Construction Stormwater General Permit (CSWGP) as identified in the Contract Special <br /> 23 Provisions. The Contracting Agency may or may not transfer coverage of the CSWGP to <br /> 24 the Contractor when a CSWGP has been obtained. The Contracting Agency may not <br /> 25 have a CSWGP for the project but may have another water quality related permit as <br /> 26 identified in the Contract Special Provisions or the Contracting Agency may not have111 <br /> 27 water quality related permits but the project is subject to applicable laws for the Work. <br /> 28 Section 8-01 covers all of these conditions. <br /> 29 <br /> 30 8-01.2 Materials <br /> 31 The first paragraph is revised to read: <br /> 32 <br /> I <br /> 33 Materials shall meet the requirements of the following sections: <br /> 34 <br /> 35 Corrugated Polyethylene Drain Pipe 9.05.1(6) <br /> 36 Quarry Spalls 9-13 <br /> 37 Erosion Control and Roadside Planting 9-14 <br /> 38 Construction Geotextile 9-33 <br /> 39I <br /> 40 8-01.3(1) General <br /> 41 This section is revised to read: <br /> 421 43 Adaptive management shall be employed throughout the duration of the project for the <br /> 44 implementation of erosion and water pollution control permit requirements for the <br /> 45 current condition of the project site. The adaptive management includes the selection <br /> 46 and utilization of BMPs, scheduling of activities, prohibiting unacceptable practices, <br /> 47 implementing maintenance procedures, and other managerial practices that when used <br /> 48 singularly or in combination, prevent or reduce the release of pollutants to waters of the I <br /> 49 State. The adaptive management shall use the means and methods identified in this <br /> 50 section and means and methods identified in the Washington State Department of <br /> 51 Transportation's Temporary Erosion and Sediment Control Manual or the Washington <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 24 OF 53 March 6,2018 <br /> WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.