My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 b. Of the Contractor (or the subcontractors or lower tier subcontractors of the <br /> 2 Contractor) to pay all laborers, mechanics, subcontractors, lower tier <br /> I 3 subcontractors, material person, or any other person who provides supplies or <br /> 4 provisions for carrying out the work; <br /> 5 4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the <br /> I 6 project under titles 50, 51, and 82 RCW; and <br /> 7 5. Be accompanied by a power of attorney for the Surety's officer empowered to sign <br /> 8 the bond; and <br /> 9 6. Be signed by an officer of the Contractor empowered to sign official statements (sole <br /> 10 proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed <br /> 11 by the president or vice president, unless accompanied by written proof of the <br /> ' 12 <br /> 13 authority of the individual signing the bond(s) to bind the corporation (i.e., corporate <br /> resolution, power of attorney, or a letter to such effect signed by the president or vice <br /> 14 president). <br /> I 15 <br /> 16 1-04.DOCX <br /> 17 Scope of Work <br /> I 18 <br /> 19 1-04.2.RTF <br /> 20 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 21 Specifications, and Addenda <br /> I22 (March 13, 2012 APWA GSP) <br /> 23 <br /> 24 Revise the second paragraph to read: <br /> 1 25 <br /> 26 Any inconsistency in the parts of the contract shall be resolved by following this order of <br /> 27 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 1 28 1. Addenda, <br /> 29 2. Proposal Form, <br /> 30 3. Special Provisions, <br /> ' <br /> 31 4. Contract Plans, <br /> 32 5. Amendments to the Standard Specifications, <br /> 33 6. Standard Specifications, <br /> 34 7. Contracting Agency's Standard Plans or Details (if any), and <br /> 35 8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> I 36 <br /> 37 1-05.GR1 <br /> 38 Control of Work <br /> I 39 <br /> 40 1-05.7.RTF <br /> 41 1-05.7 Removal of Defective and Unauthorized Work <br /> ' 42 (October 1, 2005 APWA GSP) <br /> 43 <br /> 44 Supplement this section with the following: <br /> 45 <br /> 1 46 If the Contractor fails to remedy defective or unauthorized work within the time specified <br /> 47 in a written notice from the Engineer, or fails to perform any part of the work required by <br /> 48 the Contract Documents, the Engineer may correct and remedy such work as may be <br /> I <br /> 49 <br /> 50 identified in the written notice, with Contracting Agency forces or by such other means as <br /> the Contracting Agency may deem necessary. <br /> 51 <br /> II <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 11 OF 57 March 6,2018 <br /> I WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.