My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1-07.9(1).OPTI.GR1 <br /> 2 (January 5, 2018) <br /> I 3 The Federal wage rates incorporated in this contract have been established by the <br /> 4 Secretary of Labor under United States Department of Labor General Decision No. <br /> 5 WA180001. <br /> I 6 <br /> 7 The State rates incorporated in this contract are applicable to all construction <br /> 8 activities associated with this contract. <br /> I9 <br /> 10 1-07.13.GR1 <br /> 11 Contractor's Responsibility for Work <br /> I 12 <br /> 13 1-07.13(4).GR1 <br /> 14 Repair of Damage <br /> 1 15 <br /> 16 1-07.13(4),INSTI.GR1 <br /> 17 Section 1-07.13(4) is revised to read: <br /> 18 <br /> 19 1-07.13(4).OPTI.GR1 <br /> 20 (August 6, 2001) <br /> 21 The Contractor shall promptly repair all damage to either temporary or permanent <br /> I 22 work as directed by the Engineer. For damage qualifying for relief under Sections <br /> 23 1-07.13(1), 1-07.13(2) or 1-07.13(3), payment will be made in accordance with <br /> 24 Section 1-04.4. Payment will be limited to repair of damaged work only. No <br /> I 25 payment will be made for delay or disruption of work. <br /> 26 <br /> 27 COE 1-07.17 OPTI.RTF <br /> I 28 (April 2, 2007) <br /> 29 Locations and dimensions shown in the Plans for existing facilities are in accordance <br /> 30 with available information obtained without uncovering, measuring, or other verification. <br /> I 31 <br /> 32 The following addresses and telephone numbers of utility companies known or <br /> 33 suspected of having facilities within the project limits are supplied for the Contractor's <br /> 34 convenience: <br /> 1 35 <br /> 36 *** <br /> Snohomish County PUD #1 I Puget Sound Energy <br /> I Erin Burke Lisa Griffith <br /> Everett WA, 98206 P.O. Box 97034 BOT-01G <br /> 425-783-4745 Bellevue, WA 98009-9734 <br /> I EFBurke(a�SNOPUD.COM 425-425-6472 <br /> 425-406-0121 <br /> I Frontier Communications NW Inc Comcast <br /> Tim Rennick 1525-75th Street SW#200 <br /> MC WA01040S Everett WA, 98203 <br /> I 1800 41st Street <br /> Everett, WA 98201 Casey Brown (Boeing Freeway North) <br /> 425-231-9281 425-263-5345 <br /> Tim.rennickftr.com Casey Brown2@comcast.com <br /> IJoe Fordon (City projects) <br /> Joseph fordon@comcast.com <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 17 OF 57 March 6,2018 <br /> I WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.