My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> 1O , <br /> TABLE OF CONTENTS <br /> I NOTICE TO CONTRACTORS 1 <br /> DIVISION B — BID DESCRIPTIONS 3 <br /> DIVISION P — PROPOSAL 17 <br /> IPROPOSAL SIGNATURE SHEET 23 <br /> SUBCONTRACTORS FORM 25 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 27 <br /> I NON-COLLUSTION AFFIDAVIT 29 <br /> BID DEPOSIT 31 <br /> DIVISION C — CONTRACT 35 <br /> IPAYMENT BOND 39 <br /> PERFORMANCE BOND 41 <br /> I DIVISION 1 — GENERAL REQUIREMENTS 43 <br /> General Description and Location of Project (******) 43 <br /> Design Engineer (******) 43 <br /> I Standard Specifications (******) 43 <br /> 1-01 DEFINITIONS AND TERMS 44 <br /> 1-02 BID PROCEDURES AND CONDITIONS 48 <br /> I 1-03 AWARD AND EXECUTION OF CONTRACT 53 <br /> 1 04 SCOPE OF THE WORK 56 <br /> 1-05 CONTROL OF WORK 62 <br /> 1-06 CONTROL OF MATERIAL 78 <br /> 1 07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 80 <br /> 1-08 PROSECUTION AND PROGRESS 96 <br /> 1-09 MEASUREMENT AND PAYMENT 114 <br /> 1 1-10 TEMPORARY TRAFFIC CONTROL 133 <br /> 1 11 MISCELLANEOUS (******) 137 <br /> DIVISION 2 — EARTHWORK 139 <br /> I2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP 139 <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 139 <br /> I 2-03 ROADWAY EXCAVATION AND EMBANKMENT 142 <br /> 2-04 HAUL 144 <br /> 2 07 WATERING 145 <br /> 2-08 STREET CLEANING (******) 145 <br /> I 2-09 STRUCTURE EXCAVATION 146 <br /> 2 10 SPECIAL SOIL EXCAVATION AND BACKFILL REQUIREMENTS (******) .147 <br /> 2-11 TRIMMING AND CLEANUP 153 <br /> 1 DIVISION 4 — BASES 155 <br /> 4-04 BALLAST AND CRUSHED SURFACING 155 <br /> 4-06 ASPHALT TREATED BASE 155 <br /> IDIVISION 5 — SURFACE TREATMENTS AND PAVEMENTS 157 <br /> 5-04 HOT MIX ASPHALT 157 <br /> I <br /> 5-06 PAVEMENT PATCHING (******) 161 <br /> I North Wetmore Stormwater Separation Table of Contents February, 2018 <br /> WO No— UP3659 SP - i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.