My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> I <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BID SCHEDULE <br /> IBIDDER:1-W( 3 c\ -,,,o(, <br /> IITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL <br /> NO. QUANTITY AMOUNT <br /> 1 1 LS MOBILIZATION 1 S2.5/.0D`V 325,6°3' <br /> 2 1 LS SURVEYING 4'1941100. -c - fit-1s l .ate <br /> I3 1 LS CONTRACTOR'S LIAISON )DISOD1v1 CD/ 60 <br /> 4 8,700 HR TRAFFIC CONTROL LABOR it 51 ,2S it y��i U`1 S,`?' <br /> ' MAINTENANCE AND PROTECTION --' <br /> 5 1 LS OF TRAFFIC CONTROL 31 1 � cw" �31 j <br /> TRENCH EXCAVATION SAFETY E'�' <br /> 6 1 LS SYSTEMS -L--V---©' , 2•i <br /> I <br /> 7 425 HR STREET CLEANING AND SWEEPING 1 1 .t%' jt CO0 . <br /> EROSION/WATER POLLUTION <br /> 8 1 LS s l .6> q n �� <br /> I <br /> CONTROL � <br /> 9 26,679 LF IMPROVEMENTSG in 2_ `�J 44,jtgi '50 <br /> I10 36,506 SF REMOVAL OF ASPHALT PAVEMENT f C) so $21 ‘20Li , V <br /> ' 11 4,480 SF REMOVAL OF CONCRETE <br /> PAVEMENT I Z I?-61, bb <br /> 12 6,727 SF REMOVAL OF CONCRETE i. U. $S 4 5J 7 n ,')S <br /> I <br /> SIDEWALK <br /> 13 2,379 LF REMOVAL OF CURB, CURB AND $ 2 g L �1�a3 - CjLl <br /> GUTTER `N <br /> 1 14 7,961 TON CRUSHED SURFACING BASE `Z� '� Z2oi�ii 1� <br /> COURSE t1.71-);Sur-D.17-15 6,559 TON GRAVEL BORROW ' 2kqg <br /> 16 600 TON FOUNDATION MATERIAL 10 24,9 <br /> I17 1 LS TEMPORARY ROADWAY PATCH OE i S$S,s Sr2.,g •°' <br /> 18 45 LF M <br /> RELOCATE EXISTING WATER MAIN, ,,'l L. .a„CIO $ f r 7.s <br /> 4-INCH DIA . vi <br /> North Wetmore Stormwater Separation Division P—PROPOSAL March 2018 <br /> Work Order No.—UP3659 SP—19 Addendum No.2 <br /> Elided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.