My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> ITEM PLANTOTAL <br /> ITEM DESCRIPTION UNIT PRICE <br /> NO. QUANTITY AMOUNT <br /> 40 1,600 TON HMA, CL 1/2"PG 64-22 FOR 41 112_815 `sols t0 <br /> PERMANENT TRENCH PATCH <br /> 41 450 TON HMA, CL '/z" PG 64-22 FOR OVERLAY 1 14 . 1 ,�v� 'c` <br /> I 42 517 SY TEMPORARY ASPHALT SIDEWALK 6 .23 c A 1 t igq k .'-'?--- <br /> AND CURB <br /> 43 380 SY CONCRETE SIDEWALK IL-7_ 00 4 ri �j 6° .6' <br /> ' RESTORATION i <br /> CONCRETE DRIVEWAY <br /> 44 45 SY itf Si ,Li G 4 4 IDIS 2S <br /> I <br /> RESTORATION <br /> 45 1,450 LF CONCRETE CURB, TYPE E-1 k 26) i it 42702 .So <br /> CONCRETE CURB AND GUTTER, -32 L <br /> I <br /> 46 150 LF 1.j ic4, 0 03 <br /> TYPE A-1 <br /> 47 25 LF ASPHALT EXTRUDED CURB A 5(, bo ti, ' I Li ub .`'' <br /> I48 195 LF ASPHALT WEDGE CURB k 1 ,cc) it Z -12-60 <br /> I <br /> 49 1 LS REPLACE CHAIN LINK FENCE AND (j'f rt, 0 u i 0.-- <br /> 50 1 LS ABANDONo EXISTING MONITORING � ‘,Dov t 'i i lDc;v "" <br /> 51 2 EA MONUMENT CASES 2 1"2-6 a= 4 Ifl6 Do <br /> I52 1 LS PERMANENT PAVEMENT MARKING ? S,.j SD•`' i'--3 () . cil- <br /> 53 1 FA FORCE ACCOUNT $250,000 $250,000 <br /> I e- <br /> 40 <br /> TOTAL BID AMOUNT cvCcl'ticli._( (�l`-v,.)i._s'1 3,-n ,--7 g. G '�4'-T 110 <br /> I <br /> The bid items above are described further in Division B-Bid Items Descriptions. <br /> INote: This project is associated with storm water and combined sewer system work and Section 1-07.2(2) <br /> State Sales Tax-Rule 171 of the Special Provisions is applicable for the payment of sales tax. The <br /> Contractor shall include Washington State Retail Sales Taxes in the various unit bid item prices, including <br /> I <br /> those that the Contractor pays on the purchase of materials, equipment, or supplies used or consumed in <br /> doing the Work. <br /> I <br /> I North Wetmore Stormwater Separation Division P-PROPOSAL March 2018 <br /> Work Order No.-UP3659 SP-21 Addendum No. 2 <br /> Plided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.