My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> ISUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical <br /> work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the <br /> I chart below. If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> I Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> I A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails (1) to <br /> submit as part of the Bid the names of such Subcontractors, (2) to name itself to perform such <br /> Work, or(3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> I4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors who will contract directly with the general contractor <br /> Isubmitting the Bid to the City. <br /> I Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> HEATING <br /> Subcontractor,bidder or "no work" MUST be wort <br /> 1 t <br /> stated �� w�� <br /> IVENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be <br /> stated n `� ) <br /> v o r <br /> I PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work" MUST be W P�� <br /> stated VL/ Y <br /> I ELECTRICAL (as described in RCW Chap. Ltbcrvrv} G +� is- 5 <br /> 19.28 i b f S T s nuliemisti, <br /> 3 / <br /> Subcontractor, bidder or "no work" MUST be I \et.An(, i/4. g7 610 <br /> stated <br /> I <br /> I <br /> I <br /> I <br /> I <br /> INorth Wetmore Stormwater Separation Division P—PROPOSAL February 2018 <br /> Work Order No.—UP3659 SP—25 <br /> ill <br /> vided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.